Summary
- ServerChoice should be read through official service pages that describe colocation, data-centre locations, connectivity, disaster recovery, network management and AI-oriented colocation, not through unsupported assumptions about legal structure, customers, revenue or private topology.
- The strongest source-backed signals are concrete operating-surface claims: ServerChoice presents Stevenage, London and Harlow data-centre locations; colocation packages; connectivity options; network-management services; disaster-recovery positioning; and security/certification language in its public pages.
- The dependency angle is therefore about facilities, network operations and locality questions. The article does not claim the selected image shows ServerChoice facilities, and it does not treat website marketing claims as independent proof of uptime, capacity or customer outcomes.
Directory link: ServerChoice Ops Team
Why this is a service-surface article, not a legal profile
ServerChoice is a richer public-source candidate than many small routing records because its own website exposes a broad operational story. The home page presents the company as a provider of secure colocation, disaster recovery and connectivity services from three resilient data centres. The same page points readers toward colocation, AI colocation, network management, neocloud networking, connectivity, disaster recovery, Move & Protect, and location pages for Stevenage, London and Harlow. That is enough for a substantive article, but the article still needs to name its boundary.
The linked directory entry is labelled as an operations team. That means the article should not pretend it has established every legal or corporate detail behind the public brand. It should bind itself to what the official pages say about the service surface. Those pages can support a discussion of colocation options, data-centre locations, managed network services, connectivity products and disaster-recovery positioning.
They do not by themselves prove private customer deployments, revenue, traffic volume, contractual commitments, exact live capacity, incident history, customer concentration, facility ownership details, or the current state of every service.
This boundary is especially important because ServerChoice's own pages use strong operating language. The home page says the provider offers flexible colocation from data centres described as having a 100% uptime track record. The about page says the company is privately owned, discusses sustainability, free hardware relocation and technical excellence, and includes a timeline of data-centre and network development. Location pages describe Stevenage, London and Harlow in facility terms. Service pages describe network management, connectivity, disaster recovery and AI colocation. Those are all useful signals.
They should be quoted as public website claims and interpreted carefully, not silently upgraded into audited performance findings.
A cloud-service dependency reader benefits from that discipline. If an organization is assessing where workloads, network devices, disaster-recovery environments or colocation racks might sit in an operating model, ServerChoice is relevant because the official site describes exactly those categories. But dependency risk is not decided by categories alone. It depends on what a specific customer has bought, where the equipment or cloud connection sits, who operates the network path, how contracts allocate responsibility, and what incident evidence exists. The official pages provide a public surface for those questions.
They do not answer every private implementation question.
That makes the article useful as a monitoring baseline. It records the visible service claims, the named locations, the connectivity and network-management themes, and the caveats. It avoids turning the public brand into an overbroad legal profile. It also keeps the image and directory link from implying more than they support. The result is a source-backed operating-surface note that can be updated when richer evidence appears.
What the official site says about colocation
The home and colocation pages give the clearest source-backed basis for treating ServerChoice as a data-centre and colocation subject. The home page describes flexible colocation from data centres presented as having a 100% uptime track record, with free relocation and a 30-day cooling-off period. It says ServerChoice provides colocation, connectivity and data-centre services, and it describes all facilities as having at least N+1 resilience and access to hundreds of carriers. Those are the company's public statements, not independent engineering audits, but they are concrete enough to define the topic of the article.
The colocation page adds more detail. It frames the offering as UK data-centre colocation and says the provider offers flexible, high-security colocation services across a network of UK data centres. It lists quarter, half and full racks, private suites, OCP-ready support for high-performance computing workloads, high-power-density options and an emphasis on resilience and security. That language matters because it places ServerChoice in the operating zone where customer-owned hardware, power, cooling, access control, network links and support processes meet.
The AI colocation page adds a newer demand signal. It says the provider offers AI-optimised colocation designed for high-density power and cooling requirements, with references to GPUs, TPUs, machine-learning models, large datasets and AI applications. It also repeats claims about free IP transit, security assessment and relocation in the Move & Protect bundle context. This page should not be read as proof that a specific AI workload is hosted there. It does show that ServerChoice is positioning its facilities around high-density and AI-adjacent demand, which is directly relevant to the data-centre investment topic.
That AI angle needs care. Data-centre providers increasingly use AI language because power density, cooling and network design have become commercial differentiators. A public page saying that a colocation service is built for AI does not prove GPU fleet size, customer demand, utilization or power availability at a given moment. It does, however, show what the provider is trying to sell and what kind of infrastructure problem it wants readers to associate with the brand. For dependency monitoring, that is enough to track.
It tells analysts that future ServerChoice updates should be checked for high-density power, cooling, relocation, IP transit and security-assessment language.
The home page footer also states that ServerChoice is a provider of secure colocation, network management and connectivity services from three resilient data centres and says it specializes in security, including ISO 27001 certification and PCI DSS Level 1 service-provider language. Those statements belong in the source map because security and compliance are often part of colocation buying decisions. They should remain attributed to the site. The article does not independently validate certification scope, service boundaries or current audit status.
The three-location footprint in the source set
The Stevenage, London and Harlow pages give the article a clearer locality surface than a generic services page would. ServerChoice's own navigation and home page point to these locations, and each page describes a different facility proposition. That helps readers understand why the directory entry belongs in both cloud-service dependency and data-centre investment monitoring.
The Stevenage page describes Stevenage colocation from a tried and tested data centre and says the site opened in 2008. It presents the facility as outside the M25, in Hertfordshire, accessible, low-risk and high-security. It also states that the data centre has operated with a 100% uptime track record. Again, the article should treat that as a website claim. Its evidence value is that ServerChoice publicly positions Stevenage as a mature, accessible, low-risk data-centre location with colocation services.
The London page presents a central London colocation facility. It says the site is a Tier 3 facility and frames the location as useful for businesses needing a London position. The page mentions multiple diverse power routes, London Supergrid connections, high power density, N+1 in-row cooling, biometric authentication and 24/7 on-site manned security. It also uses the London page to point readers toward Harlow, describing Harlow as a lower-risk data-centre campus outside the M25. That cross-linking is relevant because it shows how ServerChoice presents its portfolio as a set of location options rather than as one undifferentiated facility.
The Harlow page is the strongest data-centre investment signal in the source set. It describes Harlow as the UK's largest and most innovative data-centre campus, a Tier 3 facility, and a low-risk location outside the M25. It states that the campus has 43 MVA of power to site and can deliver up to 20 kW per rack. Those are specific website claims that connect directly to investment, capacity and high-density positioning.
The article can report them as public statements while avoiding the next unsupported step: it cannot say how much of that power is sold, available, contracted, customer-used or delivered in practice without additional evidence.
Taken together, the three location pages support a public footprint of Stevenage, London and Harlow. The footprint is geographic enough for a locality note and operational enough for a dependency note. It is not enough to infer customer distribution, rack utilization, exact resilience outcomes or facility ownership details. Still, it gives future monitoring concrete watch points: location page changes, power and rack-density claims, security language, cooling descriptions, connectivity claims and migration offerings.
Connectivity and network management as control surfaces
The connectivity page broadens the story beyond physical colocation. It says ServerChoice offers connectivity services and allows customers to connect to thousands of locations worldwide from ServerChoice racks. It lists IP transit, data-centre interconnects, leased lines, dark fibre and DDoS mitigation. It also describes Project JET as a next-generation colocation connectivity platform. For cloud-service dependency work, this is a key page because dependencies often live in the connections between facilities, clouds, carriers, peering exchanges and customer networks.
Connectivity claims can be easy to overstate. A page that lists IP transit, interconnects and dark fibre does not prove a particular customer's topology or performance. It does show that ServerChoice's public offering includes network paths and managed connectivity products, not only powered space. That matters because a colocation relationship often becomes operationally critical through the network as much as through the rack. If a customer hosts equipment in a facility but depends on a particular interconnect, transit path, mitigation service or managed change process, the risk surface extends beyond the physical building.
The network-management page makes that control surface even more explicit. It presents 24x7x365 monitoring, fault resolution and change management for network infrastructure delivered remotely by ServerChoice network engineers. It lists design, build and configuration; continuous monitoring of routers, switches and devices; fault diagnosis; backups and maintenance; secure support portal; and optional configuration and change management. It also says engineers can handle security updates, routing changes, firmware upgrades and policy adjustments. That is a direct operating-surface claim.
It tells readers that ServerChoice is not only selling space and connectivity; it is also offering to operate parts of the network environment.
The same page frames expertise across high-performance compute fabrics, data-centre and cloud infrastructure, ISP, fibre and carrier networks, and enterprise connectivity. The neocloud network-management page narrows this into GPU cloud infrastructure. It describes monitoring, fault resolution and change management for neocloud network infrastructure, delivered remotely by ServerChoice engineers, and speaks about GPU-as-a-service providers, AI infrastructure platforms, Kubernetes-native cloud providers and emerging neocloud operators.
These pages are relevant because they connect ServerChoice's facility story to AI infrastructure and managed operations.
The responsible conclusion is not that ServerChoice manages any named customer's network. The source set does not provide that. The conclusion is that ServerChoice publicly offers managed network operations and connectivity products that could become part of a customer's dependency chain. When an outside team evaluates provider risk, the question is not only where equipment sits. It is also who can change network configurations, who monitors devices, who responds to faults, who owns runbooks, who provides interconnects and how cloud-adjacent traffic exits the facility. ServerChoice's pages make those questions relevant.
Disaster recovery and relocation as dependency signals
The disaster-recovery page presents ServerChoice facilities as a home for mission-critical infrastructure and DR deployments. It says Stevenage and Harlow are outside the M25, positioned as lower-risk but accessible from London and the North. It also points to secure, stable environments for disaster-recovery deployments. That page is important because disaster recovery changes the meaning of a colocation provider. A rack used for a secondary site, backup environment or failover platform may sit dormant until a crisis, but the provider can still become critical at the moment the primary environment fails.
The Move & Protect page adds relocation and bundled security language. It describes a package combining cost-effective colocation with free security assessment. It repeats free relocation, free IP transit up to 100 Mbps, free cyber security, a choice of data centres, and a professional hardware relocation service. It also mentions an onboarding penetration test and ongoing vulnerability scans. Those statements are relevant because they show how ServerChoice sells migration and risk reduction, not just space.
They also create due-diligence questions: what exactly is included, what scope a security assessment covers, what service levels apply, and how responsibilities are split between customer and provider.
The article should not answer those questions without documents it does not have. It can, however, surface them. A dependency profile is most useful when it translates marketing categories into operational questions. If a provider says it will move hardware, a customer needs to know chain of custody, outage windows, insurance, rollback and access controls. If a provider says it offers vulnerability scans, a customer needs to know scope, cadence, ownership of remediation and reporting. If a provider says it includes transit, a customer needs to know capacity, failover, routing policy and DDoS handling.
Public pages start the checklist; contracts and technical runbooks finish it.
This is why ServerChoice belongs in a cloud-service-dependency lane. The services described by its own site are the kinds of services that become embedded in business continuity and infrastructure operations. Colocation, managed networks, connectivity, disaster recovery and migration are not passive labels. They are operational roles. The article does not need to overstate ServerChoice's private customer base to make that point. The public service categories are enough.
Data-centre investment and locality questions
The data-centre investment topic fits ServerChoice because the source set includes location, power, cooling, rack-density, high-density AI and campus language. Harlow's 43 MVA and up-to-20 kW-per-rack claims are the clearest examples. London's Tier 3, power-route and N+1 cooling language adds another facility profile. Stevenage's opening year and uptime-positioning claims give a mature-site narrative. The home and about pages frame the portfolio as three resilient data centres with investments in technical infrastructure.
Those claims are investment signals, not complete investment evidence. A page can state power-to-site, rack density and standards; it does not show capital expenditure, expansion timetable, current utilization, procurement constraints, grid-connection queue, cooling plant condition or customer mix. A directory article should not infer those details. It should say that the site publicly positions the portfolio around high-density and resilience, which makes ServerChoice relevant to observers tracking UK data-centre capacity and cloud-adjacent infrastructure.
Locality is similarly bounded. ServerChoice's public pages point to UK locations: Stevenage, London and Harlow. That is enough to say the public service surface is UK-location-specific. It is not enough to make a data-residency guarantee. Data residency depends on contracts, customer architecture, backup paths, managed service tooling, support access, network egress and subprocessors. A colocation site in the United Kingdom can support a UK-residency design, but it does not prove one by itself. The article should keep that distinction clear.
The same caveat applies to cloud connectivity. A facility can offer connections to cloud providers, ISPs, data centres and peering exchanges. That can improve performance or resiliency, but it also means locality analysis has to follow the path beyond the building. A workload in a ServerChoice rack may connect to a cloud, a network service, a mitigation platform, a backup target or a managed device outside the rack. Public pages cannot define the full path for any specific customer. They do show that such paths are part of the service story.
This makes ServerChoice a useful example of how data-centre investment and cloud-service dependency overlap. Investment language focuses on power, density, resilience, campus and location. Dependency language focuses on who relies on the facility, who manages the network, which connections exist, and what happens in an outage or migration. ServerChoice's pages sit across both categories. The article should preserve both without collapsing one into the other.
Certification and security language need source discipline
ServerChoice's pages repeatedly foreground security. The footer describes the company as specializing in security, with ISO 27001 certification and PCI DSS Level 1 service-provider language. Location pages speak about biometric authentication, manned security and high-security environments. The Move & Protect page mentions security assessments, penetration testing and vulnerability scanning. Those statements are relevant because security is part of how colocation and managed-network providers sell trust.
They also need careful handling. A certification phrase on a website does not tell the reader the exact scope of the certificate, the audit date, the legal entity covered, the controls tested, or whether every service in the article falls within the same scope. A security assessment offer does not prove remediation quality. Biometric or manned security language does not prove an incident record. The article should identify the security positioning, then tell readers where the evidence stops.
For a dependency reader, the useful follow-up questions are concrete. Which facility is in scope? Which service is in scope? Which staff or third parties can access equipment? How are change requests approved? How are emergency access and remote-hands tasks logged? What vulnerability scanning is included and what is excluded? What happens if a managed network device requires urgent change? The public pages make those questions natural. They do not answer them completely.
This is not a negative finding. It is normal for a public provider site to market security at a high level and leave contractual detail elsewhere. The publication standard is simply to avoid presenting broad security language as if it were a completed due-diligence report. ServerChoice's official pages show enough security positioning to make the topic material. They do not replace customer-specific review.
Image and representation limits
The selected image for this article is a real public-source photograph from Wikimedia Commons credited to the National Science Foundation. It shows a high-performance-computing facility rack context and was selected as generic infrastructure imagery. It should not be described as a ServerChoice facility, office, equipment, staff member, customer deployment, incident, or current operating environment. The article's facility claims come from ServerChoice pages, not from the photograph.
This limitation matters more for ServerChoice than for a purely abstract software company because the article discusses physical data centres. A rack-aisle photo can easily imply that the reader is seeing the provider's own site. In this case, that would be unsupported. The image is useful because it is realistic and relevant to infrastructure, not because it adds factual evidence about ServerChoice. It improves the article's visual quality without changing the source boundary.
The same rule applies to all visual future updates. A ServerChoice article should prefer realistic, non-repeating infrastructure imagery, but any company-specific facility image must have company-specific provenance. Without that, the caption and metadata should keep the generic context clear.
What future monitoring should watch
Future monitoring should start with the official site. The most important fields to refresh are the named data-centre locations, Harlow power and rack-density claims, London Tier 3 and cooling/security language, Stevenage maturity and low-risk-location language, AI colocation positioning, network-management scope, connectivity products, and disaster-recovery framing. If those pages change, the dependency reading changes with them.
The next watch point is managed-network language. The network-management and neocloud pages are particularly important because they describe operational control, not just facility access. If ServerChoice expands or narrows 24x7x365 monitoring, routing changes, firmware updates, policy adjustments, GPU fabric support or cloud-provider scope, that would affect how readers think about control-plane dependency. Managed operations are often where provider risk becomes most sensitive.
Connectivity should also be refreshed. The connectivity page names IP transit, data-centre interconnects, leased lines, dark fibre, DDoS mitigation and Project JET. Any change in those claims can affect how a customer maps resilience, egress, latency and carrier dependency. If a future article adds named cloud or carrier relationships, it should verify them from source pages that explicitly support those names.
Finally, location and locality claims should remain separate from residency claims. ServerChoice's UK facility pages give a clear public geography. They do not alone prove where a specific customer's data, backups, logs, management plane or support access reside. Future updates should keep that distinction unless contract-level or customer-specific evidence changes the basis.
How the ServerChoice claims translate into buyer risk questions
A service-surface article becomes more useful when it turns public claims into operational questions. ServerChoice's pages give enough detail to do that without pretending to know the content of any customer's contract. Colocation claims raise questions about rack density, access rules, remote hands, power resilience, cooling constraints and relocation windows. Connectivity claims raise questions about transit, interconnects, carrier diversity, route policy, DDoS mitigation and failover.
Network-management claims raise questions about change authority, monitoring visibility, device backups, escalation paths, firmware updates and emergency access.
The official site should be read as the start of that checklist. For example, the network-management page says ServerChoice engineers can handle security updates, routing changes, firmware upgrades and policy adjustments as an optional add-on. That is a meaningful control-plane statement. In a live environment, whoever can change routing, device firmware or policy can affect availability, segmentation, traffic path, compliance and recovery. The public page does not say which customer devices are managed or how approval workflows operate.
It does show that managed control is part of the offer, which means any customer relying on it should map the exact boundary.
The connectivity page creates a similar checklist. IP transit, data-centre interconnects, leased lines, dark fibre and DDoS mitigation are not interchangeable. They put different dependencies on carriers, fibre paths, mitigation platforms, routing policy and operational support. A customer using one of those services would need to know where redundancy sits, whether a path is physically diverse, what routes are announced, how change windows are handled, and what happens during a DDoS event. The public page does not answer all of that, but it tells readers that those are the right questions.
The AI colocation and neocloud pages add a high-density and GPU-network layer. They discuss power and cooling requirements for AI hardware, GPU cloud infrastructure, Kubernetes-native providers and lossless or high-performance fabric themes. These are current data-centre investment signals because AI workloads can change rack design, cooling demand, power allocation and network requirements. They are also risk signals because high-density deployments can be sensitive to power, heat, cable plant, firmware, fabric design and operational change. A public page cannot prove whether any named AI customer is present.
It can show that the provider is positioning itself for that type of workload.
The disaster-recovery and Move & Protect pages add a continuity layer. Disaster recovery is often judged only when it is needed, and relocation work can become risky because it joins physical movement, downtime planning, access control, network cutover, backup state and rollback decisions. ServerChoice's pages position the offer around lower-risk locations, relocation support, security assessment and wrap-around services. Those claims are relevant because they connect the provider to business-continuity planning.
They should not be read as proof that any particular customer can recover within a certain time objective without the contract and architecture.
A practical buyer or risk reviewer would therefore separate four layers. The first layer is public service category: colocation, connectivity, network management, disaster recovery and AI colocation. The second layer is public location: Stevenage, London and Harlow. The third layer is public operating claim: power, cooling, security, uptime positioning, monitoring, fault resolution and relocation. The fourth layer is customer-specific evidence: contract, design, deployment, runbooks and incident history. This article can describe the first three layers. It cannot invent the fourth.
Why the directory should keep the ops-contact caveat visible
The directory label matters because it prevents a subtle type of overreach. A public website may use a brand name and a directory entry may use an operations-style label. Those are not necessarily the same thing as a verified legal entity profile. If the article quietly treats the directory row as a complete company registry record, it may imply certainty the source set does not provide. The cleaner method is to say that the article links to the ServerChoice Ops Team directory entry and uses official ServerChoice pages as the public source boundary.
That method preserves what is useful. Readers still get the operating picture: data-centre locations, services, connectivity, network management and continuity themes. They also get the identity caution: the article does not resolve legal ownership, shareholder structure, entity status or all corporate affiliations. The public source set may contain hints, but the publishing gate for this slot is the official service surface plus directory availability, not a corporate law profile.
Keeping that caveat visible also helps future updates. If a future source provides company-registry detail, the directory can be enriched and the article can be updated. If the public website changes brand ownership, facility names or contact structure, the record can adapt. The current article does not need to settle those questions to be useful. It needs to avoid pretending they are settled.
The same caveat helps with customer references. Some ServerChoice pages show customer-name areas or testimonials. This article does not use those as proof of current deployments, dependency depth or active service scope. Customer logos and testimonials can be useful marketing evidence, but they are not enough to map a live customer dependency without date, scope and service detail. For this article, the durable facts are the services and locations described by ServerChoice, not a roster of dependent customers.
Operational resilience claims need a careful verb
Several pages use resilience and uptime language. The home page and location pages present facilities as resilient and refer to a 100% uptime track record. A publication can report that ServerChoice says this, but it should not transform the statement into an audited finding. The careful verb is "presents", "states", "describes" or "positions", not "proves". This matters because uptime claims depend on definition, time period, scope, exclusions and measurement method.
The same applies to Tier language. The London page describes a Tier 3 facility. The Harlow page describes a Tier 3 facility or Tier 3 standards. Those phrases are meaningful for readers who understand data-centre design, but the article does not have certification documents, design drawings, operations logs or audit files. It can place Tier language in the source map while telling readers that facility-specific due diligence would still be needed.
Power and rack-density numbers require the same treatment. Harlow's 43 MVA and up-to-20 kW-per-rack statements are specific, but specificity is not the same as current availability. A campus can have power to site, committed power, installed capacity, available capacity, reserved capacity and customer-used capacity that differ from one another. A data-centre investment observer should care about the number because it is part of the provider's public positioning. A buyer or competitor should not assume it describes what can be bought today without refreshing the source and asking for live commercial detail.
This is not a reason to exclude the numbers. On the contrary, precise public claims are exactly what a directory article should preserve. The discipline is to keep the numbers attached to their source and their limits. That lets future readers compare later claims against the earlier baseline.
The role of connectivity in data-centre investment
Data-centre investment is often discussed as real estate, power and cooling, but connectivity can decide whether a facility is usable for a given workload. ServerChoice's connectivity page makes that point implicitly by placing IP transit, data-centre interconnects, leased lines, dark fibre and DDoS mitigation next to its colocation story. A facility with strong physical attributes may still fail a workload if the network options do not fit. Conversely, a facility can gain value when it gives customers flexible paths to cloud providers, ISPs, exchanges and other data centres.
For ServerChoice, the relevant public claim is that connectivity is part of the service portfolio, not an add-on footnote. The page says customers can connect to thousands of locations worldwide from ServerChoice racks and describes direct connectivity to cloud providers, data centres and peering exchanges. This belongs in the dependency profile because it suggests that a customer's ServerChoice relationship could include external network paths, not only physical hosting. Those paths can carry both resilience benefits and additional dependencies.
The article does not claim a specific carrier map. It does not claim a particular peering exchange, cloud on-ramp, dark-fibre route or DDoS mitigation provider unless a source explicitly names it. The source set supports a category-level statement: connectivity products are part of the public offer. That category-level statement is enough to explain why the provider sits at the intersection of colocation and network dependency.
A durable evidence boundary for future readers
Future readers should preserve the same boundary even if the public site becomes richer. The durable public record in this article is the combination of ServerChoice service pages, location pages and connectivity pages. Those pages support a clear operating-surface profile: colocation, managed networks, disaster recovery, connectivity, AI-oriented high-density positioning, and named UK data-centre locations. They do not support a complete customer map, a full legal-entity dossier, an audited uptime conclusion, or a live capacity report.
That distinction should remain visible because the subject sits close to several sensitive infrastructure questions. A buyer may care about power density, security, relocation and connectivity. A risk team may care about managed routing changes, monitoring, backups and disaster-recovery placement. A locality reviewer may care about Stevenage, London and Harlow. Each of those questions is legitimate, but each requires its own evidence beyond the public pages when the question becomes customer-specific.
A narrow article can still be durable when it makes those limits explicit. It gives readers the public baseline and the right follow-up questions. If ServerChoice changes its service pages, expands location claims, revises power-density language, publishes more certification detail, or names additional network relationships, future coverage can update the baseline. Until then, the strongest conclusion remains restrained: ServerChoice's own website presents a UK colocation, connectivity and managed-network operating surface that belongs in cloud-service dependency and data-centre investment monitoring.
Sources and reading limits
The sources below set the public evidence boundary for this Phase A article. They support ServerChoice service-surface claims around colocation, data-centre locations, AI colocation, network management, connectivity, disaster recovery, relocation and security-positioning language. They do not prove customers, revenue, current capacity utilization, private topology, legal-entity conclusions, incident history, audited uptime, customer deployments, data-residency commitments, or physical facility conditions beyond the published website text.
- https://www.serverchoice.com/
- https://www.serverchoice.com/about
- https://www.serverchoice.com/colocation
- https://www.serverchoice.com/ai-colocation
- https://www.serverchoice.com/network-management
- https://www.serverchoice.com/neocloud-network-management
- https://www.serverchoice.com/connectivity
- https://www.serverchoice.com/disaster-recovery
- https://www.serverchoice.com/move-and-protect
- https://www.serverchoice.com/stevenage-colocation
- https://www.serverchoice.com/london-colocation
- https://www.serverchoice.com/harlow-colocation
