The only verified change is procedural: proposal ripencc/2024-02 was introduced on 14 October 2024. No proposal revisions, substantive policy-text changes, implementation events, or later dispositions are supplied.
RIPE NCC · RIR Watchdog
Start here for the proposal-by-proposal record: what changed, why it mattered, who argued for what, how positions evolved, what was decided, and where the evidence still has gaps.
Source facts
Who actually shaped the debate?
BTW Analysis
The only verified change is procedural: proposal ripencc/2024-02 was introduced on 14 October 2024. No proposal revisions, substantive policy-text changes, implementation events, or later dispositions are supplied.
The subject of any debate cannot be determined from the supplied record because it contains no discussion messages, arguments, objections, responses, participant stances, or stance transitions.
Neither a decision outcome nor observable discussion is established. The chronology records introduction only, while the measured record has zero messages, zero discussion participants, and zero active days. No adoption, rejection, withdrawal, abandonment, implementation, or other disposition is supplied.
Participation concentration cannot be meaningfully assessed. The top-message shares and HHI are zero because there were zero recorded messages and zero discussion participants, not because participation was broad or evenly distributed. Two formal actors are counted, but their identities, roles, actions, and positions are unknown.
No actor-level procedural or decision chokepoint can be identified from the supplied facts. The principal analytical chokepoint is the missing record after introduction and the absence of captured discussion: without later chronology, actor roles, interventions, or a decision event, control or influence cannot be attributed.
Policy text · Astra identified a substantive wording change in this retained policy section.
Initial allocation size LIRs that meet the initial allocation criteria are eligible to receive an initial allocation of /32 or /28 without needing to supply any additional information.Source facts ↗
Initial allocation size LIRs that meet the initial allocation criteria are eligible to receive an initial allocation of /32 up to /28 without needing to supply any additional information.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
Existing IPv6 address space holders LIRs that hold one or more IPv6 allocations that were originally issued directly by the RIPE NCC as a single prefix may request an extension of each such allocation up to a /28 without the need for additional documentation.Source facts ↗
Existing IPv6 address space holders Organizations, not LIRs, that hold one or more IPv6 allocations that were originally issued directly by the RIPE NCC as a single prefix may request once an extension of one of such allocation up to a /28 without the need for additional documentation.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
Allowing extensions only for allocations originally issued as a single prefix avoids the risk of abuse by infinitely extending chunks resulting from partial IPv6 transfers. RIPE NCC confirmed that there are 22,682 IPv6 allocations.Source facts ↗
The proposal allows only one extension per organization, which limits some of the potential adverse effects of stockpiling.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
Policy text · Astra identified a substantive wording change in this retained policy section.
Arguments Opposing the Proposal This policy proposal is perceived as counterproductive to conservation efforts.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
This is by simplifying the way LIRs can obtain IPv6 address space suitable for their networks’ operational requirements. The proposal originates from the opinions expressed by members of the RIPE community in the Address Policy Working Group during presentations [1], interim sessions [2] and a call with the WG Co-Chairs on this topic.Source facts ↗
This is by simplifying the way LIRs can obtain IPv6 address space suitable for their networks’ operational requirements.The proposal originates from the opinions expressed by members of the RIPE community in the Address Policy Working Group during presentations [1], interim sessions [2] and a call with the WG Co-Chairs on this topic.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
Existing IPv6 address space holders Organizations, not LIRs, that hold one or more IPv6 allocations that were originally issued directly by the RIPE NCC as a single prefix may request once an extension of one of such allocation up to a /28 without the need for additional documentation.Source facts ↗
Existing IPv6 address space holders A Member, that holds one or more IPv6 allocations originally issued directly to them by the RIPE NCC as a single prefix, may request an extension of one of these allocations up to a /28 without the need for additional documentation.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
The proposal allows only one extension per organization, which limits some of the potential adverse effects of stockpiling.Source facts ↗
The proposal allows only one extension per Member, which limits some of the potential adverse effects of stockpiling.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
This is by simplifying the way LIRs can obtain IPv6 address space suitable for their networks’ operational requirements.The proposal originates from the opinions expressed by members of the RIPE community in the Address Policy Working Group during presentations [1], interim sessions [2] and a call with the WG Co-Chairs on this topic.Source facts ↗
This is by simplifying the way LIRs can obtain IPv6 address space suitable for their networks’ operational requirements. The proposal originates from the opinions expressed by members of the RIPE community in the Address Policy Working Group during presentations [1], interim sessions [2] and a call with the WG Co-Chairs on this topic.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
Existing IPv6 address space holders A Member, that holds one or more IPv6 allocations originally issued directly to them by the RIPE NCC as a single prefix, may request an extension of one of these allocations up to a /28 without the need for additional documentation.Source facts ↗
Existing IPv6 address space holders LIRs that hold one or more IPv6 allocations originally issued directly by the RIPE NCC as a single prefix can request an extension of one of these allocations up to a /28 without providing further documentation.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
The proposal allows only one extension per Member, which limits some of the potential adverse effects of stockpiling.Source facts ↗
The proposal allows only one extension per LIR without further justification, which limits some of the potential adverse effects of stock-pilers.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
The proposal allows only one extension per Member, which limits some of the potential adverse effects of stockpiling.Source facts ↗
It also addresses the RIPE NCC Executive Board’s concerns in the previous impact analysis about using “Members” instead of “LIRs”.Source facts ↗
Policy text · Astra identified a substantive wording change in this retained policy section.
Sixty-eight of them already have /28 or shorter prefixes (so 22,614 of them are /29-/32).Source facts ↗
68 of them already have /28 or shorter prefixes (so 22,614 of them are /29 - /32).Source facts ↗
Partial