Skip to main content

APNIC · RIR Watchdog

Review of ICP-2 and the RIR Governance Document

Start here for the proposal-by-proposal record: what changed, why it mattered, who argued for what, how positions evolved, what was decided, and where the evidence still has gaps.

Source facts

Policy ID
unnumbered-icp2-rir-governance-review-2023
RIR
APNIC
Official status
under_discussion
Introduced
Unknown
Last source update
Sep 17, 2026

Who actually shaped the debate?

1Total participants
1Discussion contributors
1Discussion messages
1Effective participants
100%Top-five discussion share
1People covering 50%
1People covering 80%

BTW Analysis

BTW Analysis

What changed

Version 3.4, labelled the ASO AC Final Draft and website version 3, presents a proposed lifecycle framework that succeeds ICP-2. It covers recognition of new RIRs, ongoing operational obligations, audits and compliance reviews, emergency continuity, rehabilitation and possible derecognition, and amendment. The supplied record contains no earlier draft or redline, so it establishes the draft’s scope—not which provisions changed between versions. The policy remains under discussion.

What the debate was really about

The central institutional question is how far shared RIR and ICANN governance should reach into recognition, oversight, emergency service continuity and removal of an RIR, and what checks accompany that authority. The draft pairs stronger, auditable obligations with collective decision gates. From BTW’s accountability and practical-exit perspective, the key issue is whether those gates provide meaningful checks and whether continuity arrangements protect affected resource holders—not simply whether the draft describes itself as open or community-driven.

Decision vs debate

The ASO AC-to-NRO EC handoff was reported on 28 July 2026; that is procedural progress, not evidence of substantive endorsement or a final decision. Version 3.4 was published on 1 September as an ASO AC Final Draft. The verified policy status is under discussion. The supplied record does not establish adoption, rejection, entry into force or implementation.

Participation concentration

The captured discussion has one message from one participant on one active day; that participant’s statement is classified as procedural or neutral. The dataset’s concentration measures are therefore maximal, but they describe only this one-message sample. Its completeness is not established, so these figures cannot show how broadly the wider regional or global process was attended or supported.

Chokepoint analysis

The draft assigns substantial decision authority to the existing RIRs and ICANN. A candidate RIR must satisfy specified support, capability, impact and improvement criteria; ICANN cannot recognize it without assessments supporting the proposal from at least two-thirds of RIRs submitting assessments. For derecognition, ICANN makes the final decision but cannot act without supportive assessments from at least two-thirds of the RIRs other than the subject RIR. Member groups can initiate a compliance review at 15% or 1,000 members, whichever is less, and submit a derecognition proposal at 25% or 2,000, whichever is less; these are triggers, not final decision rights. The draft also provides for disclosure of RIR interests and permits ICANN to exclude a materially affected RIR’s negative recommendation from the recognition threshold, subject to notice and an opportunity to respond. Emergency continuity can be initiated by the affected RIR, or with ICANN and two-thirds of the other RIRs following discussion with the affected RIR and its community where reasonably possible; arrangements are time-limited unless renewed. Derecognition generally follows a reasonable opportunity to remedy noncompliance through rehabilitation. These safeguards matter, but the structure still places key recognition and system-continuity gates with institutions rather than affected resource holders. The text provides for temporary operators, transition plans and successor or interim entities; it does not state an unconditional resource-holder right to move Number Resources between registry environments.

Uncertainties

  • The supplied record contains only Version 3.4, so earlier wording and the draft’s development cannot be reconstructed.
  • The one-message sample’s collection scope and completeness are not established; it cannot resolve how much wider consultation or support existed.
  • The participant’s institutional role is not supplied, and the captured procedural statement does not establish a substantive position on the draft.
  • The document says consultations are neither prevented nor required for recognition or derecognition assessments. The supplied discussion sample does not establish what consultation occurred beyond the reported handoff.
  • The status is under discussion; no adoption, rejection, effective date or implementation outcome is established.

Policy evolution

Debate timeline

  1. Public discussion

    [apnic-talk] ASO AC delivers Recommended Draft RIR Governance Document to NRO EC

    1 Discussion messages · 1 Entities

    Source facts ↗
  2. Official version

    Version 3.4 (ASO AC Final Draft); website version 3

    Source facts ↗

Entities

Last updated:

Loading

Sources and coverage

Public discussion archives

Coverage

Earliest captured: Jun 1, 2001
Latest captured: Nov 17, 2026