Confidence
1- Public role
- Profile subject linked to reviewed BTW article evidence.
- Information type
- This record preserves FCC's organization identity while leaving legal entity, network resources, service scope, leadership, and related public sources open for enrichment.
Related details
- A Cable-Landing Permit Has More Than One Clock
authorized human evidence
Last updated: 2026-08-27
Current status
Related research
12- FCC lines up spectrum auctions after C-band
Upper C-band has auction rules and a deadline, while the 1.6GHz, 2.7GHz, 4.4GHz and 7GHz bands remain at different identification and study stages.
Primary articlePublished 2026-09-18 - FCC opens five-year rural wireless test zone in Iowa
Iowa State's ARA testbed can now run wireless experiments across Ames and surrounding farmland under a five-year FCC Innovation Zone designation.
Primary articlePublished 2026-09-17 - FCC sets vote on new satellite spectrum
The FCC will vote on 30 September on proposals to open more than 1,000MHz across the 12GHz and 42GHz bands for satellite connectivity.
Primary articlePublished 2026-09-10 - A Cable-Landing Permit Has More Than One Clock
A financing model may show one date for a United States submarine-cable landing permit. The real schedule has separate clocks for application completeness, national-security review, mitigation and final regulatory action—and some do not start when the application is filed.
Primary articlePublished 2026-08-24 - FCC puts US terrestrial 100/20 coverage at 96.9%
Satellite lifts the FCC's reported 100/20 broadband availability to 99.7%, but terrestrial coverage remains lower and satellite performance can vary.
Primary articlePublished 2026-08-19 - Trump nominates Danielle Thumann Severs for FCC seat
US President Donald Trump has nominated Danielle Thumann Severs to the FCC; confirmation would add a fourth commissioner and create a one-seat quorum margin.
Primary articlePublished 2026-08-11 - China’s US countermeasures turn compliance into a chain of bottlenecks
Beijing’s response to new US restrictions is not one embargo. It combines case-by-case drone export review, named-company prohibitions, a change in who may inspect American factories for Chinese certification and an investigation into printing technology. The economic effect will depend on which narrow control becomes the slowest step in a company’s supply chain.
Primary articlePublished 2026-08-06 - NTIA sends 4.4GHz spectrum study plan to Congress
NTIA has sent the 4.4GHz study plan to Congress, starting a 60-day review before agencies can receive funding for engineering work.
Primary articlePublished 2026-08-04 - The FCC has moved Covered List risk inside the device
The Federal Communications Commission has closed a route by which a product could obtain a new US authorization even when its essential logic came from a company already judged a security risk. The rule changes the compliance question from who assembled the finished device to who made the hardware that can control it.
Primary articlePublished 2026-07-23 - Broadband labels survive, but their bulk-data shadow does not
The FCC has kept consumer broadband labels while removing the separate machine-readable spreadsheet and the two-year archive for discontinued plans. Providers lose two compliance systems; comparison tools and researchers lose structured and historical evidence. The 3–0 decision trades administrative cost against outside scrutiny rather than abolishing disclosure.
Primary articlePublished 2026-07-22 - The FCC has redesigned the satellite-licensing queue, not removed it
Part 100 turns satellite licensing into a more explicit sorting system. Applications that fit standard, presumed-acceptable conditions should move through a predictable lane; exceptions receive targeted review. The gain is administrative sequence, not permission to ignore interference, safety or launch constraints.
Primary articlePublished 2026-07-22 - FCC’s Upper C-band winners will inherit the bill for clearing it
The FCC has adopted rules for a future auction of 160MHz between 3.98GHz and 4.14GHz. The spectrum is valuable because it can extend the existing C-band mobile ecosystem, but it is not empty: satellite users must move and aircraft altimeters must be upgraded. Future licensees will pay eligible transition costs before they can deploy.
Primary articlePublished 2026-07-22
