Intelligence Search
Search BTW Intelligence
Search published BTW.MEDIA intelligence across governance, market, people, company, and member-access coverage. Results connect articles with infrastructure actors, public evidence, regional context, operating exposure, customer dependency, and follow-up questions so readers can move from a keyword query to a clearer research path.
Study Group
Study Group appears in US with 2 supporting public references but no confirmed operator yet; BTW tracks it to link these public clues to a responsible organisation and its relationships.
Rüdiger Geib takes the helm at Internet Engineering Task Force and Study Group 12
Study Group 12 (ITU-T SG12), the standardization arm of the International Telecommunication Union. This group focuses on developing
RIPE NCC Split ENUM's Future From 23 Troubled Delegations
Study Group 2 meeting makes a careful retreat from a system-wide question. RIPE NCC now says Public
How criminals used AI face apps to swindle users: A China case study exposes the risks
After a group used AI to turn photos into videos to access user bank accounts, netizens ask is
Two /24s and an obsolete name: ICL (Thailand) as a study of the enterprise connectivity economy, upstream dependence, and trust frictions in Thailand
ICL (THAILAND) is a legacy network identity of an Isuzu group company, not a retail ISP. Its AS38554
NETLimited Webmaster and the accountability record behind a network role
group contact attached to NETLIMITED LLC and AS10585, carrying technical, administrative and abuse-facing responsibility through one old role handle. That makes it less a product profile than a study
FANN Has Adopted a Problem Statement. It Has Not Coordinated a Network Action.
group a text to improve and asks its authors to carry adoption-call feedback into later versions. It is not a network instruction. The same draft deliberately leaves action coordination for later study
The appeal with a clock, but no door out of the house
group guidelines, loosened the proposed constraints around urgent Board variance and added an implementation timetable. These were meaningful changes to a private technical process, not acts of legislation. On 21 November, staff identified unresolved drafting and sequencing problems; at AFRINIC
