AFRINIC · RIR 观察
IPv4 Soft Landing
从这里开始,逐项查看提案记录:发生了哪些变化、为何重要、各方提出了什么主张、立场如何演变、最终作出了什么决定,以及证据仍存在哪些缺口。
来源事实
- 政策编号
- AFPUB-2026-IPv4-001-DRAFT02
- RIR
- AFRINIC
- 官方状态
- Ratified
- 提出时间
- 2026年6月16日
- 最近来源更新
- 2026年11月24日
究竟是谁影响了这场辩论?
政策演变
Recovered-space quarantine and scope · Draft 2 replaces draft 1's fixed six-month quarantine with a twelve-month starting period that AFRINIC may reduce, including when available space falls below a /13 or for other operational reasons. It expressly includes returned or recovered addresses from any original pool. Phase irreversibility and the priority of Soft-Landing allocation rules remain. The longer starting period responds to the first assessment's cleanup concern; neither document proves that cleanup or redelegation occurred.
来源事实 −
recovered resources, regardless of their size, will refill the existing pool after a 6 months quarantine period.来源事实 ↗
来源事实 +
Any IPv4 resources returned or recovered thereafter, irrespective of their size or original pool, shall be returned to the “available space” pool only following a quarantine period of twelve (12) months. AFRINIC may reduce the quarantine period, for example when “available space” is below a /13 or other operational reasons.来源事实 ↗
Release and replenishment of the reserved /12 · The second draft adds an express mechanism to release the final-/8 reserve and replenish it with recovered space from any available pool, including space still in quarantine. The earlier assessment asked how recovered space and the reserved /12 should enter the available pool. The second assessment describes bringing the reserve into use when an available-pool request cannot be satisfied. Those are proposal text and staff interpretation, not evidence that the reserve was actually released or that quarantined addresses were delegated.
来源事实 −
The sequence of filling available pool - recovered space first as soon as policy is implemented?来源事实 ↗
来源事实 +
Once IPv4 addresses are recovered, the /12 from the final /8 can be released and refilled with the recovered addresses from any other “available space”, even if they are under quarantine period.来源事实 ↗
Staff clarification and implementation work · The first assessment requests additional clarity about the recovery pool and recommends a longer initial quarantine. The second records no outstanding staff clarification requests and changes the procedures entry to introducing an automated cleanup and monitoring tool. Both retain a six-month implementation estimate. This records the assessment's changed position and planned work; it does not establish implementation completion or eliminate the need to distinguish the proposal's wording from staff's operating interpretation.
Version chronology and retained status context · The first draft's own history dates initial posting to 6 May 2026, despite the archived page's conflicting 2020 submission field. Draft 2's history dates its revision to 16 June 2026 and says it addresses the impact analysis. This comparison therefore runs from draft 1 to draft 2, regardless of when the archive was discovered. The later retained draft-2 capture used here says Last call; that is a capture-specific status, not proof of ratification or a replacement for subsequent status evidence. The eight-month utilisation and SAW periods already appear in draft 1 and are substantially retained in the more formal draft-2 wording.
Procedural status; unchanged proposal text · The later retained page reports consensus awaiting Board ratification, replacing last call. Both captures retain proposal version 2.0 and the operative policy wording is unchanged. This is a status update, not evidence of Board ratification or a new proposal version. The captures bound when the change was observed, not its precise decision date.
Policy ratification status · The page-level status changes from consensus awaiting Board ratification to ratified, with 25 September 2026 recorded as the AFRINIC Board ratification date. The remainder of the captured document is unchanged.
讨论时间线
实体
加载中
来源与覆盖
公开讨论记录
覆盖范围
最早收录: 2004年8月4日