跳转到主要内容

AFRINIC · RIR 观察

IPv4 Soft Landing

从这里开始,逐项查看提案记录:发生了哪些变化、为何重要、各方提出了什么主张、立场如何演变、最终作出了什么决定,以及证据仍存在哪些缺口。

来源事实

政策编号
AFPUB-2026-IPv4-001-DRAFT02
RIR
AFRINIC
官方状态
Ratified
提出时间
2026年6月16日
最近来源更新
2026年11月24日

究竟是谁影响了这场辩论?

2参与者总数
1讨论参与者
1正式角色
1讨论消息
1有效参与者
100%前五名讨论占比
1覆盖 50% 讨论的人数
1覆盖 80% 讨论的人数

政策演变

2.0
最后征求意见 · Last call(Presented at AF37 24 June 2026)
2026年6月16日
来源事实 ↗

Recovered-space quarantine and scope · Draft 2 replaces draft 1's fixed six-month quarantine with a twelve-month starting period that AFRINIC may reduce, including when available space falls below a /13 or for other operational reasons. It expressly includes returned or recovered addresses from any original pool. Phase irreversibility and the priority of Soft-Landing allocation rules remain. The longer starting period responds to the first assessment's cleanup concern; neither document proves that cleanup or redelegation occurred.

Release and replenishment of the reserved /12 · The second draft adds an express mechanism to release the final-/8 reserve and replenish it with recovered space from any available pool, including space still in quarantine. The earlier assessment asked how recovered space and the reserved /12 should enter the available pool. The second assessment describes bringing the reserve into use when an available-pool request cannot be satisfied. Those are proposal text and staff interpretation, not evidence that the reserve was actually released or that quarantined addresses were delegated.

Staff clarification and implementation work · The first assessment requests additional clarity about the recovery pool and recommends a longer initial quarantine. The second records no outstanding staff clarification requests and changes the procedures entry to introducing an automated cleanup and monitoring tool. Both retain a six-month implementation estimate. This records the assessment's changed position and planned work; it does not establish implementation completion or eliminate the need to distinguish the proposal's wording from staff's operating interpretation.

Version chronology and retained status context · The first draft's own history dates initial posting to 6 May 2026, despite the archived page's conflicting 2020 submission field. Draft 2's history dates its revision to 16 June 2026 and says it addresses the impact analysis. This comparison therefore runs from draft 1 to draft 2, regardless of when the archive was discovered. The later retained draft-2 capture used here says Last call; that is a capture-specific status, not proof of ratification or a replacement for subsequent status evidence. The eight-month utilisation and SAW periods already appear in draft 1 and are substantially retained in the more formal draft-2 wording.

2.0
最后征求意见 · Last call(Presented at AF37 24 June 2026)
2026年6月16日
来源事实 ↗
2.0
未知 · Consensus (Awaiting Ratification by Board)(Presented at AF37 24 June 2026)
2026年6月16日
来源事实 ↗

Procedural status; unchanged proposal text · The later retained page reports consensus awaiting Board ratification, replacing last call. Both captures retain proposal version 2.0 and the operative policy wording is unchanged. This is a status update, not evidence of Board ratification or a new proposal version. The captures bound when the change was observed, not its precise decision date.

2.0
已接受 · RatifiedRatified by the AFRINIC Board on 25 September 2026(Presented at AF37 24 June 2026)
2026年6月16日
来源事实 ↗

Policy ratification status · The page-level status changes from consensus awaiting Board ratification to ratified, with 25 September 2026 recorded as the AFRINIC Board ratification date. The remainder of the captured document is unchanged.

讨论时间线

  1. 公开讨论

    [AfriNIC-rpd] Last Call: IPv4 Soft Landing Policy - AFPUB-2010-v4-005-draft-03

    1 讨论消息 · 1 实体

    来源事实 ↗
  2. 官方版本

    1

    未知 · Archived

    来源事实 ↗
  3. 正式提出

    正式提出

    来源事实 ↗
  4. 官方版本

    2.0

    最后征求意见 · Last call(Presented at AF37 24 June 2026)

    来源事实 ↗
  5. 官方版本

    2.0

    最后征求意见 · Last call(Presented at AF37 24 June 2026)

    来源事实 ↗
  6. 官方版本

    2.0

    未知 · Consensus (Awaiting Ratification by Board)(Presented at AF37 24 June 2026)

    来源事实 ↗
  7. 官方版本

    2.0

    已接受 · RatifiedRatified by the AFRINIC Board on 25 September 2026(Presented at AF37 24 June 2026)

    来源事实 ↗

实体

最近更新:

加载中

来源与覆盖

公开讨论记录

覆盖范围

最早收录: 2004年8月4日
最近收录: 2026年11月25日