Consulta aquí el historial de cada propuesta: qué cambió, por qué fue relevante, quién defendió cada postura, cómo evolucionaron las posiciones, qué se decidió y dónde persisten las lagunas en la evidencia.

Hechos con fuentes

ID de política
AFPUB-2026-IPv4-001-DRAFT02
RIR
AFRINIC
Estado oficial
Ratified
Presentada
16 jun 2026
Última actualización de fuentes
24 nov 2026

¿Quiénes marcaron realmente el debate?

2Participantes totales
1Participantes del debate
1Actores formales
1Mensajes de discusión
1Participantes efectivos
100 %Cuota de los cinco principales
1Personas que cubren el 50 %
1Personas que cubren el 80 %

Evolución de la política

2.0
Última llamada · Last call(Presented at AF37 24 June 2026)
16 jun 2026
Hechos con fuentes ↗

Recovered-space quarantine and scope · Draft 2 replaces draft 1's fixed six-month quarantine with a twelve-month starting period that AFRINIC may reduce, including when available space falls below a /13 or for other operational reasons. It expressly includes returned or recovered addresses from any original pool. Phase irreversibility and the priority of Soft-Landing allocation rules remain. The longer starting period responds to the first assessment's cleanup concern; neither document proves that cleanup or redelegation occurred.

Release and replenishment of the reserved /12 · The second draft adds an express mechanism to release the final-/8 reserve and replenish it with recovered space from any available pool, including space still in quarantine. The earlier assessment asked how recovered space and the reserved /12 should enter the available pool. The second assessment describes bringing the reserve into use when an available-pool request cannot be satisfied. Those are proposal text and staff interpretation, not evidence that the reserve was actually released or that quarantined addresses were delegated.

Staff clarification and implementation work · The first assessment requests additional clarity about the recovery pool and recommends a longer initial quarantine. The second records no outstanding staff clarification requests and changes the procedures entry to introducing an automated cleanup and monitoring tool. Both retain a six-month implementation estimate. This records the assessment's changed position and planned work; it does not establish implementation completion or eliminate the need to distinguish the proposal's wording from staff's operating interpretation.

Version chronology and retained status context · The first draft's own history dates initial posting to 6 May 2026, despite the archived page's conflicting 2020 submission field. Draft 2's history dates its revision to 16 June 2026 and says it addresses the impact analysis. This comparison therefore runs from draft 1 to draft 2, regardless of when the archive was discovered. The later retained draft-2 capture used here says Last call; that is a capture-specific status, not proof of ratification or a replacement for subsequent status evidence. The eight-month utilisation and SAW periods already appear in draft 1 and are substantially retained in the more formal draft-2 wording.

2.0
Desconocida · Consensus (Awaiting Ratification by Board)(Presented at AF37 24 June 2026)
16 jun 2026
Hechos con fuentes ↗

Procedural status; unchanged proposal text · The later retained page reports consensus awaiting Board ratification, replacing last call. Both captures retain proposal version 2.0 and the operative policy wording is unchanged. This is a status update, not evidence of Board ratification or a new proposal version. The captures bound when the change was observed, not its precise decision date.

2.0
Aceptada · RatifiedRatified by the AFRINIC Board on 25 September 2026(Presented at AF37 24 June 2026)
16 jun 2026
Hechos con fuentes ↗

Policy ratification status · The page-level status changes from consensus awaiting Board ratification to ratified, with 25 September 2026 recorded as the AFRINIC Board ratification date. The remainder of the captured document is unchanged.

Cronología del debate

  1. Debate público

    [AfriNIC-rpd] Last Call: IPv4 Soft Landing Policy - AFPUB-2010-v4-005-draft-03

    1 Mensajes de discusión · 1 Entidades

    Hechos con fuentes ↗
  2. Versión oficial

    1

    Desconocida · Archived

    Hechos con fuentes ↗
  3. Presentación

    Presentación

    Hechos con fuentes ↗
  4. Versión oficial

    2.0

    Última llamada · Last call(Presented at AF37 24 June 2026)

    Hechos con fuentes ↗
  5. Versión oficial

    2.0

    Última llamada · Last call(Presented at AF37 24 June 2026)

    Hechos con fuentes ↗
  6. Versión oficial

    2.0

    Desconocida · Consensus (Awaiting Ratification by Board)(Presented at AF37 24 June 2026)

    Hechos con fuentes ↗
  7. Versión oficial

    2.0

    Aceptada · RatifiedRatified by the AFRINIC Board on 25 September 2026(Presented at AF37 24 June 2026)