跳转到主要内容

RIPE NCC · RIR 观察

Revised IPv6 PI Assignment Policy

从这里开始,逐项查看提案记录:发生了哪些变化、为何重要、各方提出了什么主张、立场如何演变、最终作出了什么决定,以及证据仍存在哪些缺口。

来源事实

政策编号
2024-01
RIR
RIPE NCC
官方状态
Withdrawn
提出时间
2024年8月13日
最近来源更新
2026年11月24日

究竟是谁影响了这场辩论?

2参与者总数
2正式角色

政策演变

2.0
2024年8月13日
来源事实 ↗

End Site definition deferred to another proposal · Version 2 removes the proposed section 2.9 split between allocation-based and PI End Sites, including the detailed routing-policy, Layer 2, customer-device and anycast tests. Its rationale says the new End Site definition will be handled in a separate proposal. The remaining references to End Sites therefore must not be read as adopting those deleted tests.

Planning horizon for a larger PI assignment · Version 2 changes the expected-utilisation planning horizon used to justify larger or additional PI space from twelve to twenty-four months. Current or planned routing policies remain an alternative example of justification, and the nibble-boundary sizing sequence remains /48, /44, /40 and /36.

One growth procedure for existing PI holders · Version 2 applies the extension procedure to holders of one or more PI assignments without the former implementation-date distinction. It deletes the separate legacy reevaluation section. When contiguous expansion is unavailable, the holder may request a new assignment and must return previous assignments within six months; the old automatically described replacement becomes a request option.

Legacy renumbering extensions removed · Version 1 offers older assignments a twelve-month renumbering period with repeat twelve-month extensions on proof of continuing use and inability to renumber. Version 2 omits that exceptional regime and states six months for returning previous assignments after a replacement. It does not impose a new immediate renumbering obligation on every untouched existing assignment.

Explicit prohibition on splitting registrations omitted · Version 2 removes the sentence forbidding post-implementation PI registrations from being split into independent smaller assignments. The aggregation objective and permission to route more-specific prefixes without sub-assignment remain. Deleting this specific sentence does not by itself grant a general right to sub-assign or transfer fragments.

Special-purpose size exception omitted · Version 2 drops the express permission for more-specific special-purpose PI policies to depart from generic assignment criteria. The generic bounds remain. The deletion removes that cross-policy clarification; the retained proposal alone does not determine the continuing effect of a separate IXP assignment policy.

Reservation responsibility made explicit · Version 2 expressly recommends that RIPE NCC reserve space up to the next nibble boundary, replacing the recommendation simply to leave that space unused. The amount of recommended growth room is unchanged; the operational actor is now named.

3.0
2024年8月13日
来源事实 ↗

Remote End Site prohibition qualified by routing exchange · Version 3 adds without the exchange of Internet routing information to the sentence prohibiting use of a PI prefix to connect another entity’s separate End Site. This qualifies the prior blanket wording and aligns it with the preceding ISP interconnection example. It does not delete the general prohibition on sub-assignment or establish unrestricted permission to provide customer access using PI space.

Persistent addressing terminology · Version 3 changes static to persistent in the server/appliance addressing example and its explanatory purpose. It supplies no new duration, assignment-size rule or addressing mechanism. The same-site condition and the surrounding /56-or-longer connectivity wording remain unchanged.

讨论时间线

  1. 正式提出

    正式提出

    来源事实 ↗
  2. 官方版本

    1.0

    来源事实 ↗
  3. 官方版本

    2.0

    来源事实 ↗
  4. 官方版本

    3.0

    来源事实 ↗
  5. 官方决定

    withdrawn

    withdrawn

    来源事实 ↗

实体

最近更新:

加载中

来源与覆盖

公开讨论记录

覆盖范围

最早收录: 1992年6月30日
最近收录: 2026年11月14日