究竟是谁影响了这场辩论?
政策演变
Proposal title and stated protocol scope · The title removes the IPv6 qualifier, changing from “Clarification on IPv6 Sub-Assignments” to “Clarification on Sub-Assignments.”
Applicability to APNIC assignments and allocations · The new problem statement expressly limits the proposal to direct APNIC end-user assignments and LIR assignments for exclusive infrastructure use, and expressly excludes LIR allocations; the old problem statement begins without this applicability limitation.
来源事实 −
When the policy was drafted, the concept of assignments/sub-assignments did not consider a practice very common in IPv4 which is replicated and even amplified in IPv6: the use of IP addresses for point-to-point links or VPNs.来源事实 ↗
来源事实 +
Note that this proposal is ONLY relevant when end-users obtain direct assignments from APNIC, or when a LIR obtains, also from APNIC, and assignment for exclusive use within its infrastructure. Consequently this is NOT relevant in case of LIR allocations.来源事实 ↗
IPv4 NAT and WAN-link rationale · The old text attributes the lack of an IPv4 problem to NAT usage. The new text qualifies this as applying when NAT is used and adds that assigned addresses are then limited to the WAN link as infrastructure or interconnection addressing.
Objective and APNIC existing-practices rationale · The old objective includes a separate explanation about redefining the concept for new IPv6 uses. The new objective omits that explanation and instead states that the ISP, data-center, and similar-case prohibition accords with existing APNIC practices.
来源事实 −
This proposal clarifies this situation in this regard and better define the concept, particularly considering new uses of IPv6 (RFC8273), by means of new text. It also clarifies that the usage of sub-assignments in ISPs, data centers and similar cases is not allowed.来源事实 ↗
来源事实 +
It also clarifies that the usage of sub-assignments in ISPs, data centers and similar cases is not allowed, according to the existing practices of APNIC.来源事实 ↗
Situation in other regions · The old text describes RIPE as corrected, notes a RIPE policy/impact-analysis discrepancy, says an amendment was submitted, identifies AfriNIC as having reached consensus, and says submissions were made to LACNIC and ARIN. The new text instead states directly that the situation has been corrected in AFRINIC, ARIN, LACNIC, and RIPE.
来源事实 −
This situation, has already been corrected in RIPE, and the policy was updated in a similar way, even if right now there is a small discrepancy between the policy text that reached consensus and the RIPE NCC Impact Analysis. A new policy proposal has been submitted to amend that, and the text is the same as presented by this proposal at APNIC. Same text has also been submitted to AfriNIC (already reached consensus), LACNIC and ARIN.来源事实 ↗
Form of the proposed amendment · The old version instructs that a new paragraph be added after the existing paragraph and labels the existing wording “Actual text.” The new version removes that instruction and labels the existing wording “Current Text.”
Permitted use and prohibited sub-assignments in proposed Section 2.2.3 · The proposed operative text is reformulated: “original holder” becomes “original recipient,” use by third-party devices is conditioned on operation within the infrastructure, and the prohibition is restated as sub-assignments to third parties outside that infrastructure and provision of address space to third parties in data centers or similar cases.
来源事实 −
The address space assignment is only for use by the original holder of said assignment, as well as for third party devices, as long as they are operating within the original holder infrastructure. Sub-assignments are not allowed outside that infrastructure (for example using sub-assignments for ISP customers), neither for providing addressing space to third parties in data-centers (or similar cases)来源事实 ↗
来源事实 +
The assigned address space must only be used by the original recipient of the assignment, as well as for third party devices provided they are operating within said infrastructure. Therefore, sub-assignments to third parties outside said infrastructure (for example using sub-assignments for ISP customers), and providing addressing space to third parties in data-centers (or similar cases), are not allowed.来源事实 ↗
讨论时间线
实体
加载中
来源与覆盖
公开讨论记录
- apnic-sig-policy –
- apnic-sig-policy –
- apnic-academy-talk-apnic.net –
- apnic-afg-community-apnic.foundation –
- apnic-apac-ict-women-apnic.net –
- apnic-apnic-alumni-apnic.net –
- apnic-apnic-announce-apnic.net –
- apnic-apnic-foundation-discuss-apnic.foundation –
- apnic-apnic-services-apnic.net –
- apnic-apnic-talk-lists.apnic.net –
- apnic-apnic-transfers-apnic.net –
- apnic-bgp-stats-lists.apnic.net –
- apnic-community-elections-apnic.net –
- apnic-community-events-apnic.net –
- apnic-diversity-in-leadership-apnic.net –
- apnic-ianaxfer-apnic.net –
- apnic-icp-2review-apnic.net –
- apnic-measurement-apnic.net –
- apnic-mvnog-apnic.net –
- apnic-orbit-discuss-apnic.net –
- apnic-pngnog-apnic.net –
- apnic-security-discuss-apnic.net –
- apnic-sig-cooperation-apnic.net –
- apnic-sig-guidelines-review-apnic.net –
- apnic-sig-nir-lists.apnic.net –
- apnic-sig-routingsecurity-apnic.net –
- apnic-user-feedback-group-apnic.net –
- apnic-wg-pdr-apnic.net –
- apnic-youth4ig-lists.apnic.net –
- www.apnic.net/community/policy/policy-sig
- conference.apnic.net
- apnic-apix-chair-apnic.net
- apnic-apix-secretary-apnic.net
- apnic-apix-treasurer-apnic.net
覆盖范围
最早收录: 2001年6月1日
最近收录: 2026年11月17日