AFRINIC · RIR ウォッチ
AFPUB-2019-GEN-006-DRAFT03
提案ごとの記録はここから確認できます。何が変わり、なぜ重要だったのか、誰が何を主張し、立場がどう変化し、何が決定され、どの点で証拠がなお不足しているのかを追えます。
出典に基づく事実
- ポリシー ID
- AFPUB-2019-GEN-006-DRAFT03
- RIR
- AFRINIC
- 公式ステータス
- Ratified
- 正規化ステータス
- 承認
- 提出日
- 2021/04/19
- 出典の最終更新
- 2026/11/07
- 収録範囲
- 一部
実際に議論を方向づけたのは誰か?
ポリシーの変遷
Trust anchor named in the explanation · Draft 2 corrects the explanation of AFRINIC's bogon ROAs to name AFRINIC's TAL instead of APNIC's. This corrects the stated validation context; it does not direct AFRINIC to issue ROAs under APNIC's trust anchor.
出典に基づく事実 −
When AFRINIC issues a ROA with AS0 for unallocated address space under AFRINIC’s administration, BGP announcements covering this space will be marked as Invalid by networks doing RPKI based BGP Origin Validation using APNIC’s TAL.出典に基づく事実 ↗
出典に基づく事実 +
When AFRINIC issues a ROA with AS0 for unallocated address space under AFRINIC’s administration, BGP announcements covering this space will be marked as Invalid by networks doing RPKI based BGP Origin Validation using AFRINIC’s TAL.出典に基づく事実 ↗
Separate trust anchor option · Draft 2 adds the option of a distinct TAL for AS0 ROAs, allowing opt-in use and separate measurements, particularly during initial deployment. The choice and other operational details remain at AFRINIC's discretion. The requirement to remove AS0 ROAs before allocating covered resources remains unchanged.
出典に基づく事実 −
Address space can only be allocated once the ROA or ROAs with origin AS0 have been fully removed and are not visible in the repositories.出典に基づく事実 ↗
出典に基づく事実 +
The AS0 ROAs could be under a distinct Trust Anchor Locator (TAL), so it becomes an opt-in service and provides separate measurements, at least in the initial deployment phases. This and other operational details are left to the discretion of AFRINIC.出典に基づく事実 ↗
Staff interpretation of covered resources · The draft-2 snapshot adds a staff interpretation that unallocated and unassigned space includes available and reserved inventory, newly received IANA/PTI prefixes, and returned or reclaimed resources. This elaborates the existing coverage rule in a staff assessment; it is not a separate adopted policy clause.
出典に基づく事実 −
AFRINIC will create ROAs with origin AS0 for all the unallocated and unassigned address space (IPv4 and IPv6) for which it is the current administrator.出典に基づく事実 ↗
出典に基づく事実 +
unallocated and unassigned space here means available and reserved space as per the AFRINIC extended delegated stats file. New prefixes received from IANA/PTI would immediately have AS0 ROA's. Any prefixes returned by or reclaimed from members will also have AS0 ROAs出典に基づく事実 ↗
Staff assessment of ROA validity · New staff assessment text assumes a ten-year validity period unless proposal authors specify another period. The proposal itself continues to leave validity and revocation procedures to AFRINIC staff, and the assessment also asks for clarification. The ten-year assumption is not presented as a new binding policy duration.
出典に基づく事実 −
The process for ROA validity periods and release of ROAs before assignment/allocation by AFRINIC is left for AFRINIC staff to define in internal procedures.出典に基づく事実 ↗
出典に基づく事実 +
The validity period for these ROAs shall be 10 years (as it currently is for all ROAs) unless a specific validity period is specified by the policy proposal authors.出典に基づく事実 ↗
Staff deployment recommendation · The added staff assessment recommends a separate trust anchor and estimates implementation within six months of Last Call. These are the staff's historical recommendation and estimate, not evidence that deployment occurred.
出典に基づく事実 −
The process for ROA validity periods and release of ROAs before assignment/allocation by AFRINIC is left for AFRINIC staff to define in internal procedures.出典に基づく事実 ↗
出典に基づく事実 +
Impact on RPKI On the RPKI side, 3 options have been scoped notably, Use the existing AFRINIC RPKI Tree Additional Production certificate (0/0) for unallocated space only New Trust Anchor with a single Production Certificate AFRINIC recommends option C because it then becomes an opt-in service and does not pollute the current RPKI. Legal Assessment No comments 5.0 Implementation Timeline The policy can be implemented as written within 6 months from the Last Call.出典に基づく事実 ↗
Cross-registry context · The references change from APNIC consensus, a RIPE NCC proposal and intended submissions elsewhere to reported consensus in APNIC and LACNIC. This updates the proposal's historical context and does not establish any other registry's present policy.
出典に基づく事実 −
4.0 References An equivalent proposal has already reached consensus in APNIC (https:// www.apnic.net/community/policy/proposals/prop-132) )and has been proposed in RIPE NCC (https:// www.ripe.net/participate/policies/proposals/2019-08). )It is also in preparation for submission to the other RIRs.出典に基づく事実 ↗
出典に基づく事実 +
4.0 References An equivalent proposal has already reached consensus in APNIC and LACNIC.出典に基づく事実 ↗
Timing for reclaimed resources · Draft 3 adds an explicit condition that reclaimed resources enter the AS0 ROA coverage only at the end of the reclamation process. Draft 2 required coverage of all unallocated and unassigned resources without this explicit timing qualification. The separate-trust-anchor option and removal of ROAs before allocation remain.
出典に基づく事実 −
AFRINIC will create ROAs with origin AS0 for all the unallocated and unassigned address space (IPv4 and IPv6) for which it is the current administrator.出典に基づく事実 ↗
出典に基づく事実 +
AFRINIC should add reclaimed resources only at the end of the reclamation process.出典に基づく事実 ↗
Staff choice of deployment architecture · The draft-3 staff implementation section commits to a new separate trust anchor if the proposal reaches consensus and ratification; draft 2 only recommends that option among three alternatives. This is the documented implementation plan, not proof of an operational deployment.
出典に基づく事実 −
AFRINIC recommends option C because it then becomes an opt-in service and does not pollute the current RPKI.出典に基づく事実 ↗
出典に基づく事実 +
5.0 Implementation Should this proposal reaches consensus and is ratified, the implementation will be done on a new (separate) Trust Anchor so that it becomes an opt-in service and does not impact the current RPKI setup出典に基づく事実 ↗
Historical implementation estimate · The staff estimate changes from six months after Last Call to implementation by Q2 2022, linked in the surrounding text to the planned myafrinic v2 migration. These are historical planning statements; neither establishes the present deployment status or a new current deadline.
出典に基づく事実 −
5.0 Implementation Timeline The policy can be implemented as written within 6 months from the Last Call.出典に基づく事実 ↗
Staff clarification status · The draft-3 assessment records no clarification requests where draft 2 asks about the AS0 ROA validity period. Both assessments retain the ten-year assumption unless authors specify otherwise, so this change does not itself alter the duration.
出典に基づく事実 −
3.0 AFRINIC Staff Clarification Requests What will be the validity period of these AS0 ROAs? 10 years?出典に基づく事実 ↗
Recorded proposal status · The draft-2 snapshot is marked Archived and the draft-3 snapshot Ratified. These are captured page labels, not proof of the date of ratification or implementation; draft 3's implementation table still describes the policy as awaiting implementation.
出典に基づく事実 +
Date Submitted 19 April 2021 Author(s) Haitham El-Nakhal, Yazid Akanho Version 3 Obsoletes None Status Ratified出典に基づく事実 ↗
議論のタイムライン
公開議論
[rpd] RPKI ROAs for Unallocated and Unassigned AFRINIC Address Space AFPUB-2019-GEN-006-DRAFT02
8 ディスカッションのメッセージ · 3 エンティティ
出典に基づく事実 1 ↗出典に基づく事実 2 ↗公開議論
[rpd] REPORT ON Appeal against the non-consensus determination on proposal AFPUB-2019-GEN-006-DRAFT02 (RPKI ROAs for Unallocated and Unassigned AFRINIC Address Space – Draft 2).
16 ディスカッションのメッセージ · 7 エンティティ
出典に基づく事実 ↗公開議論
[rpd] REPORT ON Appeal against the non-consensus determination on proposal AFPUB-2019-GEN-006-DRAFT02 (RPKI ROAs for Unallocated and Unassigned AFRINIC Address Space ? Draft 2).
6 ディスカッションのメッセージ · 5 エンティティ
出典に基づく事実 ↗公開議論
[rpd] REPORT ON Appeal against the non-consensus determination on proposal AFPUB-2019-GEN-006-DRAFT02 (RPKI ROAs for Unallocated and Unassigned AFRINIC Address Space ? Draft 2).
17 ディスカッションのメッセージ · 9 エンティティ
出典に基づく事実 ↗公開議論
[rpd] REPORT ON Appeal against the non-consensus determination on proposal AFPUB-2019-GEN-006-DRAFT02 (RPKI ROAs for Unallocated and Unassigned AFRINIC Address Space ? Draft 2).
2 ディスカッションのメッセージ · 2 エンティティ
出典に基づく事実 ↗公開議論
[rpd] [PDWG-Appeal] REPORT ON Appeal against the non-consensus determination on proposal AFPUB-2019-GEN-006-DRAFT02 (RPKI R
22 ディスカッションのメッセージ · 8 エンティティ
出典に基づく事実 ↗
エンティティ
読み込み中
出典と収録範囲
公式ポリシー資料
公開討議のアーカイブ
- afrinic-rpd
- 最初の収録
- 2004/08/04
- 最新の収録
- 2026/08/25
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 11,100
- 既知の欠落
- 0
- www.afrinic.net
- afrinic-africann
- 最初の収録
- 2026/08/03
- 最新の収録
- 2026/11/03
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 2,574
- 既知の欠落
- 1
- afrinic-afripv6-discuss
- 最初の収録
- 2015/08/17
- 最新の収録
- 2026/09/18
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 2,538
- 既知の欠落
- 0
- afrinic-announce
- 最初の収録
- 2015/08/18
- 最新の収録
- 2026/09/18
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 2,497
- 既知の欠落
- 0
- afrinic-community-discuss
- 最初の収録
- 2015/09/11
- 最新の収録
- 2019/12/29
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 3,209
- 既知の欠落
- 0
- afrinic-dbwg
- 最初の収録
- 2016/09/09
- 最新の収録
- 2026/10/21
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 702
- 既知の欠落
- 0
- afrinic-dnssec-ops
- 最初の収録
- 2015/08/18
- 最新の収録
- 2016/12/01
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 307
- 既知の欠落
- 0
- afrinic-icp2-review
- 最初の収録
- 2025/04/10
- 最新の収録
- 2025/11/10
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 0
- 既知の欠落
- 0
- afrinic-measurement-wg
- 最初の収録
- 2018/02/01
- 最新の収録
- 2024/11/22
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 138
- 既知の欠落
- 0
- afrinic-mira
- 最初の収録
- 2020/11/17
- 最新の収録
- 2024/11/22
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 0
- 既知の欠落
- 0
- afrinic-ois-wg
- 最初の収録
- 2021/09/09
- 最新の収録
- 2024/11/22
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 0
- 既知の欠落
- 0
- afrinic-rpki-discuss
- 最初の収録
- 2016/01/15
- 最新の収録
- 2026/04/23
- 最終更新
- 2026/11/07
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 154
- 既知の欠落
- 0
収録範囲
一部
最初の収録: 2004/08/04
最新の収録: 2026/11/07
更新状況
既知の欠落
- www.afrinic.net: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- www.afrinic.net: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-rpd: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- www.afrinic.net: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-africann: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-afripv6-discuss: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-announce: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-community-discuss: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-dbwg: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-dnssec-ops: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-measurement-wg: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-rpki-discuss: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
