Aller au contenu principal

AFRINIC · Veille des RIR

IPv6 in Soft Landing

Commencez ici pour consulter l’historique, proposition par proposition : ce qui a changé, pourquoi cela comptait, qui a défendu quoi, comment les positions ont évolué, ce qui a été décidé et quelles lacunes subsistent dans les preuves.

Faits sourcés

Identifiant
AFPUB-2026-v6-001-DRAFT03
RIR
AFRINIC
Statut officiel
Under Discussion
Introduction
22 mai 2026
Dernière mise à jour des sources
24 nov. 2026

Qui a réellement façonné le débat ?

2Total des participants
2Acteurs formels

Évolution de la politique

2.0
En discussion · Under Discussion
14 juin 2026
Faits sourcés ↗

Measurable IPv6 traffic deployment milestones · DRAFT02 adds measurable deployment conditions to the existing requirement for a coherent IPv6 plan. Applicants must identify their network's actual top 25 IPv4 traffic destinations; for destinations that support IPv6, compliance requires at least 25% IPv6 within 12 months, 50% within 24 months and 75% within 48 months. These thresholds concern traffic to IPv6-enabled destinations, not an unconditional percentage of all network traffic.

IPv6 reachability milestones for hosted services · DRAFT02 adds a separate compliance measure for networks hosting services, applications or content: AAAA records must be available and the services reachable over IPv6 from the Internet, with thresholds of 25% within 12 months, 75% within 24 months and 95% within 48 months. The retained DRAFT01 requires a coherent deployment plan but contains none of these hosting percentages.

Staff impact assessment added to the retained page · The newer retained page includes a staff impact assessment where the earlier page says the assessment will be available later. Staff asks for explicit definitions of a coherent deployment plan, retrospective review, milestone evidence, the interaction with CPM 6.4.4, and consequences of partial compliance or justified delay. These are staff recommendations and unresolved implementation questions; they are not additional enacted policy requirements.

2.0
Remplacée · ArchivedSuperseded by AFPUB-2026-v6-001-DRAFT03
14 juin 2026
Faits sourcés ↗

DRAFT02 archived after DRAFT03 supersession · The retained DRAFT02 page changes from Under Discussion to Archived and states that DRAFT03 superseded it on 17 September 2026. The page retains the same DRAFT02 proposal wording and staff impact assessment for reference. Its new revision-history entry reports changed criteria in DRAFT03, but this pair of DRAFT02 snapshots does not contain those new criteria and cannot establish their substance or policy adoption.

Chronologie du débat

  1. Version officielle

    1

    Inconnue · Archived

    Faits sourcés ↗
  2. Version officielle

    DRAFT01

    Inconnue · Archived

    Faits sourcés ↗
  3. Présentation

    Présentation

    Faits sourcés ↗
  4. Version officielle

    2.0

    En discussion · Under Discussion

    Faits sourcés ↗
  5. Version officielle

    2.0

    En discussion · Under Discussion

    Faits sourcés ↗
  6. Version officielle

    2.0

    Remplacée · ArchivedSuperseded by AFPUB-2026-v6-001-DRAFT03

    Faits sourcés ↗
  7. Décision officielle

    under_discussion

    under_discussion

    Faits sourcés ↗
  8. Version officielle

    3.0

    En discussion · Under Discussion

    Faits sourcés ↗

Entités

Dernière mise à jour:

Chargement

Sources et couverture

Archives des discussions publiques

Couverture

Première capture: 4 août 2004
Dernière capture: 25 nov. 2026