AFRINIC · Veille des RIR
Out-Of-Region Use of AFRINIC Internet Number Resources
Commencez ici pour consulter l’historique, proposition par proposition : ce qui a changé, pourquoi cela comptait, qui a défendu quoi, comment les positions ont évolué, ce qui a été décidé et quelles lacunes subsistent dans les preuves.
Faits sourcés
- Identifiant
- afpub-2014-gen-002
- RIR
- AFRINIC
- Statut officiel
- Withdrawn
- Statut normalisé
- Retirée
- Introduction
- 3 juil. 2014
- Dernière mise à jour des sources
- 11 sept. 2026
- Couverture
- Partielle
Qui a réellement façonné le débat ?
Évolution de la politique
ceiling_calculation · The ceiling remains 40% of resources in use. The formula changes from x-y, with x defined as allocation/assignment size, to y explicitly defined as used space. The revision history attributes the arithmetic clarification to draft-02 and the allocation-only terminology to draft-03; this comparison does not treat Douglas's nearby suggestion of 30% as adopted draft text.
Faits sourcés −
Total space in use shall be calculated as follows: if x be the > allocation/assignment size; and x-y the amount of space in use at time z, > then 40% of (x-y) shall be the ceiling).Faits sourcés ↗
Faits sourcés +
Total space in use shall be calculated as follows: if x be the allocation size; and y the amount of space in use at time z, then 40% of y shall be the ceiling).Faits sourcés ↗
resource_scope · The operative scope narrows from allocations and assignments to allocations. The draft-03 history explicitly says assignments were removed. The summary still contains allocated/assigned wording, so the source retains an editorial inconsistency; this is a proposal comparison, not proof of adoption or current enforceability.
Faits sourcés −
f. This policy shall apply to past, present and future > allocations/assignments made by AFRINIC.Faits sourcés ↗
Faits sourcés +
This policy shall apply to present and future allocations made by AFRINIC.Faits sourcés ↗
retrospective_application · The express reference to past allocations is removed while present and future allocations remain. The draft-03 changelog identifies retrospective application as the reason; it does not establish an exemption for every currently used older allocation.
Faits sourcés −
This policy shall apply to past, present and future > allocations/assignments made by AFRINIC.Faits sourcés ↗
Faits sourcés +
Remove “past” from 3.f. This is to solve the issue of applying the policy retrospectivelyFaits sourcés ↗
stated_beneficiary · The problem statement shifts its reference from AFRINIC's best interests to those of the AFRINIC community. This changes the stated rationale, without changing the 40% ceiling, staff compliance discretion or the cited soft-landing termination condition.
Faits sourcés −
resources for sale or use outside the region - a practice that is not in > AFRINIC's best interests.Faits sourcés ↗
Faits sourcés +
resources for sale or use outside the region -- a practice that is not in the best interests of the AFRINIC community.Faits sourcés ↗
Permission and threshold for out-of-region use · Draft 4 retains the 40% ceiling and the requirement that out-of-region use be preceded by in-region use, while expressing the permission as applying after ratification and defining the ceiling against the amount in use. The comparison reports the proposal wording without treating it as an enacted rule.
Faits sourcés −
This policy allows up to 40% of Internet number resources in use by a member to be outside the region.Faits sourcés ↗
Faits sourcés +
Upon ratification of this policy, out-of-region use of AFRINIC's number resources shall be permitted as long it is preceded by use within the region. Notwithstanding 3a, the number resources used outside the region at any time shall not exceed 40% of theFaits sourcés ↗
Measurement evidence and staff assessment · Draft 3 leaves assessment to AFRINIC staff's discretion using whatever means are available. Draft 4 adds Whois and global routing table evidence, allows other consistency criteria, and directs staff to use that defined basis for due diligence. This is a proposal comparison, not proof of implementation.
Faits sourcés −
AFRINIC staff shall at their discretion, and using whatever means are available, assess compliance with 3.a/b. This policy shall forthwith be part of the acceptableFaits sourcés ↗
Faits sourcés +
Regional Internet Number resources usage will be determined using Whois database information, global routing table announcements, and for purposes of consistency, other criteria prescribed by AFRINIC. AFRINIC staff shall by use of 3c, carryout due diligence to assess compliance with 3a and 3b. This policy shall forthwith be part of the acceptable use policy for Internet numbers and aFaits sourcés ↗
Temporal scope of allocations · Draft 3 says the policy applies to present and future allocations. Draft 4 says it applies to past, present and future allocations. The comparison records the broader proposed temporal wording and does not infer retroactive enforcement or adoption.
Faits sourcés −
This policy shall apply to present and future allocations made by AFRINIC.Faits sourcés ↗
Faits sourcés +
This policy shall apply to past, present and future allocations made by AFRINIC.Faits sourcés ↗
Chronologie du débat
Débat public
[rpd] Re: Staff Assessment for AFPUB-2014-GEN-002-DRAFT-01
3 Messages de discussion · 1 Entités
Faits sourcés 1 ↗Faits sourcés 2 ↗Débat public
[rpd] AfriNIC policy AFPUB-2014-GEN-002-DRAFT-01 reject
13 Messages de discussion · 9 Entités
Faits sourcés ↗Débat public
[rpd] Re: rpd Digest, Vol 97, Issue 17
2 Messages de discussion · 2 Entités
Faits sourcés ↗Débat public
RE: [rpd] Afrinic policy proposal—Afrinic Service guild lines
3 Messages de discussion · 2 Entités
Faits sourcés ↗
Entités
- Messages de discussion7Première activité22 oct. 2014Dernière activité13 janv. 2016Première position expliciteInconnueDernière position expliciteInconnueChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques13Actualité: Périmé
Dernière tentative de recherche: 25 sept. 2026
Identité vérifiée: 25 sept. 2026
Federal University Oye-Ekiti · Historique Job Principal Network Engineer Organisation Federal University Oye-Ekiti
meeting.afrinic.netProfils publics vérifiés
- Messages de discussion
- 7
- Première activité
- 22 oct. 2014
- Dernière activité
- 13 janv. 2016
- Première position explicite
- Inconnue
- Dernière position explicite
- Inconnue
- Changements de position
- 0
- Cohérence du point de vue
- Éléments insuffisants pour évaluer la cohérence
- Autres politiques
- 13
Première position explicite: Inconnue → Dernière position explicite: Inconnue · Changements de position: 0
Cohérence du point de vue: Éléments insuffisants pour évaluer la cohérence
Seun Ojedeji's available statements mainly document policy-development procedure rather than personal positions on the merits of proposals. His two February 2015 explanations consistently distinguish ordinary IPv4 allocation requirements from an anycast purpose. His questions about out-of-region use do not establish a settled position, and the co-chairs' differing consensus reports concern different proposals and stages. The record therefore supports a narrow finding of consistent operational interpretation, but not a general verdict on his substantive views across these policies.
Évaluation: Cohérent · The two February 2015 explanations are compatible: an ordinary IPv4 application must meet the usual utilization requirements, and anycast may then be its intended use within the policy and bylaws. The later agreement clarifies the earlier distinction rather than reversing it.
Réserves: This finding concerns the interpretation of ordinary allocation requirements, not support for a particular policy amendment. · Only the two supplied February 2015 statements establish this continuity.
Correct but at that point, it's a normal v4 application with all the utilization requirements.
Agree; so long as the normal v4 allocation requirements are meet which includes utilization requirements, the purpose can then be anycast or anything within the limitation of the policy/bylaw ;)
Évaluation: Éléments insuffisants pour évaluer la cohérence · The July 2013 reminder keeps No Reverse Unless Assigned in last call and sets out how comments will be assessed. It gives no personal position on the proposal's merits and no second substantive statement with which to assess continuity.
Réserves: The announced future assessment and communication date are plans, not evidence of a decision already made.
All comments that were received from the Public policy meeting (AFRINIC18, Lusaka) and up until 31st July 2013 will be evaluated by the co-chairs to determine the final state of this policy proposal, which will be communicated to the PDWG on 2013-08-08 by the co-chairs.
Anycast resource assignments in the AFRINIC region
Évaluation: Éléments insuffisants pour évaluer la cohérence · The sequence reports meeting consensus and last call, then an unopposed minor change and a forthcoming recommendation, and finally a draft awaiting Board ratification. These are compatible stages of a process. They do not establish a sustained personal stance on the anycast proposal's substantive terms.
Réserves: A report of meeting consensus or an intended recommendation is not proof of Board ratification. · The suggestion to propose an update through the normal PDP is procedural advice, not endorsement of that update.
The co-chairs will soon formally recommend ratification of this policy proposal to the AFRINIC Board.
There is a related policy awaiting board ratification which you may want to look at and then propose an update through following the normal PDP (policy development process)
Resource Reservations for Internet Exchange Points
Évaluation: Éléments insuffisants pour évaluer la cohérence · The December 2014 report of no consensus and the later AFRINIC-22 agenda both place IXP resource reservations in continuing discussion. Neither states Ojedeji's personal position, so they cannot establish consistency or inconsistency on the proposed reservation rules.
Réserves: No consensus at one meeting is not permanent rejection; scheduling further discussion is not endorsement.
Resource Reservation for Internet Exchange Points (AFPUB-2014-GEN-004-DRAFT-01)
Number Resources Transfer Policy (AFPUB-2015-GEN-001-DRAFT-01)
Évaluation: Éléments insuffisants pour évaluer la cohérence · The two January 2016 messages report the same AFRINIC23 outcome for the transfer proposal; the second explicitly repairs formatting. They are not two independent personal opinions and provide no basis for a verdict on Ojedeji's substantive transfer-policy stance.
Réserves: The reported outcome is no consensus and a return to the mailing list, not personal opposition or the policy's later status.
Number Resources Transfer Policy (AFPUB-2015-GEN-001-DRAFT-01) No Consensus ? back to *rpd *list
Initial attempt got out of format. trying again.
Number Resources Transfer Policy (AFPUB-2015-GEN-001-DRAFT-01) No Consensus ? back to *rpd *list
AFRINIC Whois Database Update Process
Évaluation: Éléments insuffisants pour évaluer la cohérence · The only supplied statement reports that the author withdrew the Whois Database Update Process proposal. Reporting another person's withdrawal does not disclose Ojedeji's own view of the proposal or a change in that view.
Réserves: This is a co-chairs' meeting-status announcement, not the sender withdrawing his own support.
Out-Of-Region Use of AFRINIC Internet Number Resources
Évaluation: Éléments insuffisants pour évaluer la cohérence · The October 2014 messages question how the proposal would affect expansion in Africa and the resource needs of offshore offices and points of presence. Later messages announce discussion, a revised draft and no-consensus outcomes. The questions do not settle a personal position, and the procedural announcements cannot supply one or demonstrate its reversal.
Réserves: The no-consensus reports describe their respective meetings and must not be treated as the policy's current status. · The May 2015 update notice contains an inconsistent policy identifier; its title, author and out-of-region-use link identify its subject without resolving that documentary error.
Just to be clear, do you think this policy will deny availability of IP resource to organisations that intend to expand their growth in Africa?
In summary you are saying offshore offices and pops devices will require so much IP resource than the customers being served by the organisation [1]
Draft Policy name: Out-Of-Region Use of AFRINIC Internet Number Resources Unique identifier: AFPUB-2014-GEN-001-DRAFT-03
Out-Of-Region Use of AFRINIC Internet Number Resources (AFPUB-2014-GEN-002-DRAFT-03) No Consensus ? back to *rpd *list
Évaluation: Éléments insuffisants pour évaluer la cohérence · Reporting no consensus for Service Guidelines and later placing it on the meeting agenda are compatible procedural acts. Neither provides a substantive personal position to compare over time.
Réserves: Continuing the discussion does not imply support, and the earlier no-consensus report does not imply permanent rejection.
AFRINIC Service Guidelines (AFPUB-2014-GEN-005-DRAFT-01)
AFRINIC Board statement on resource allocation — 25 November 2014
Évaluation: Éléments insuffisants pour évaluer la cohérence · The December 2014 reply invites the other participant to turn a suggested protection into a written policy proposal. That single invitation establishes a preference for using the policy process, but not endorsement of a particular allocation threshold or enough evidence to assess change over time.
Réserves: Do not infer support for a specific /18 threshold from the invitation to draft a policy.
I have spotted a possible policy item ;) could you consider writing a policy that achieve what you've mentioned above?
Anycast resource assignments in the AFRINIC region · Out-Of-Region Use of AFRINIC Internet Number Resources
Évaluation: Éléments insuffisants pour évaluer la cohérence · The same co-chairs' announcement reports consensus and last call for anycast while returning out-of-region use to the list without consensus. Different outcomes for different proposals do not demonstrate contradictory personal positions: the announcement records the meeting's conclusions, not Ojedeji's votes or a common substantive rule applied inconsistently.
Réserves: Assess personal consistency only from attributable substantive positions, preserving the distinction between a chair's procedural reporting and individual advocacy.
- 22 oct. 2014 · Question ou clarification
[rpd] AfriNIC policy AFPUB-2014-GEN-002-DRAFT-01 reject
How will the example below be affected by this policy, if the $200million is indeed for growth/expansion within the region?
Faits sourcés ↗ - 24 oct. 2014 · Procédural ou neutre
[rpd] AfriNIC policy AFPUB-2014-GEN-002-DRAFT-01 reject
offshore offices and pops devices will require so much IP resource
Faits sourcés ↗ - 5 déc. 2014 · Procédural ou neutre
[rpd] Policy Proposals and Minutes of the PDP Meeting in Mauritius - Status
Les éléments de preuve validés ne sont pas disponibles.
Faits sourcés ↗ - 15 mai 2015 · Procédural ou neutre
[rpd] Agenda for Policy Development Working Group(PDWG) meeting at AFRINIC-22
Out-Of-Region Use of AFRINIC Internet Number Resources (AFPUB-2014-GEN-002-DRAFT-02)
Faits sourcés ↗ - 27 mai 2015 · Procédural ou neutre
[rpd] Proposal update - "Out-Of-Region Use of AFRINIC Internet Number Resources" (AFPUB-2014-GEN-001-DRAFT-03)
Draft Policy name: Out-Of-Region Use of AFRINIC Internet Number Resources
Faits sourcés ↗ - 13 janv. 2016 · Procédural ou neutre
[rpd] Policy Proposals and Minutes of the PDP Meeting in Congo - Status/Propositions de politiques et rendu de la réunion PDP au Congo - État
Out-Of-Region Use of AFRINIC Internet Number Resources (AFPUB-2014-GEN-002-DRAFT-03) No Consensus ? back to *rpd *list
Faits sourcés ↗ - 13 janv. 2016 · Procédural ou neutre
[rpd] Policy Proposals and Minutes of the PDP Meeting in Congo - Status/Propositions de politiques et rendu de la réunion PDP au Congo - État
Out-Of-Region Use of AFRINIC Internet Number Resources (AFPUB-2014-GEN-002-DRAFT-03) No Consensus ? back to *rpd *list
Faits sourcés ↗
Chronologies des positions par politique:AFPUB-2012-DNS-001 · Inconnue · Éléments insuffisants pour évaluer la cohérenceAFPUB-2012-GEN-001 · Inconnue · Aucune position explicite n’a été énoncéeAFPUB-2012-V4-001 · Inconnue · CohérentAFPUB-2013-GEN-001 · Inconnue · Aucune position explicite n’a été énoncéeAFPUB-2013-V4-001 · Inconnue · Aucune position explicite n’a été énoncéeAFPUB-2013-V4-002 · Inconnue · Aucune position explicite n’a été énoncéeAFPUB-2013-V6-001 · Inconnue · Aucune position explicite n’a été énoncéeAFPUB-2014-GEN-001 · Inconnue · Éléments insuffisants pour évaluer la cohérenceafpub-2014-gen-002 · Inconnue · Éléments insuffisants pour évaluer la cohérenceAFPUB-2014-GEN-003 · Inconnue · Éléments insuffisants pour évaluer la cohérenceafpub-2014-gen-004 · Inconnue · Éléments insuffisants pour évaluer la cohérenceAFPUB-2014-GEN-005 · Inconnue · Éléments insuffisants pour évaluer la cohérenceAFPUB-2015-GEN-001 · Inconnue · Éléments insuffisants pour évaluer la cohérenceAFRINIC Board statement on resource allocation — 25 November 2014 · Inconnue · Éléments insuffisants pour évaluer la cohérenceMessages de politique: 91
- Messages de discussion5Première activité23 sept. 2014Dernière activité27 oct. 2014Première position expliciteSoutienDernière position expliciteSoutienChangements de position0Cohérence du point de vueAucune évaluation de cohérence validéeAutres politiques15
- Messages de discussion3Première activité2 oct. 2014Dernière activité27 mai 2015Première position expliciteInconnueDernière position expliciteInconnueChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques6
- H.Lu · Identité non résolueMessages de discussion2Première activité22 oct. 2014Dernière activité26 oct. 2014Première position expliciteOppositionDernière position expliciteSoutienChangements de position1Cohérence du point de vueCohérentAutres politiques1
- Messages de discussion2Première activité22 oct. 2014Dernière activité22 oct. 2014Première position expliciteOppositionDernière position expliciteOppositionChangements de position0Cohérence du point de vueAucune évaluation de cohérence validéeAutres politiques2
- Keshwarsingh Nadan · Identité non résolueMessages de discussion2Première activité27 oct. 2014Dernière activité27 oct. 2014Première position expliciteSoutienDernière position expliciteSoutienChangements de position0Cohérence du point de vueCohérentAutres politiques0
- gehoumi · Identité non résolueMessages de discussion1Première activité24 oct. 2014Dernière activité24 oct. 2014Première position expliciteInconnueDernière position expliciteInconnueChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques0
- Vladimir Kangin · Identité non résolueMessages de discussion1Première activité19 oct. 2014Dernière activité19 oct. 2014Première position expliciteOppositionDernière position expliciteOppositionChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques1
- Kofi ANSA AKUFO · Identité non résolueMessages de discussion1Première activité27 oct. 2014Dernière activité27 oct. 2014Première position expliciteSoutienDernière position expliciteSoutienChangements de position0Cohérence du point de vueCohérentAutres politiques3
- Victor · Identité non résolueMessages de discussion1Première activité22 oct. 2014Dernière activité22 oct. 2014Première position expliciteOppositionDernière position expliciteOppositionChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques0
- Borg · Identité non résolueMessages de discussion1Première activité22 oct. 2014Dernière activité22 oct. 2014Première position expliciteOppositionDernière position expliciteOppositionChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques2
- Messages de discussion1Première activité22 oct. 2014Dernière activité22 oct. 2014Première position expliciteInconnueDernière position expliciteInconnueChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques10
- Mark Tinka · Identité non résolueMessages de discussion1Première activité25 oct. 2014Dernière activité25 oct. 2014Première position expliciteSoutienDernière position expliciteSoutienChangements de position0Cohérence du point de vueÉléments insuffisants pour évaluer la cohérenceAutres politiques2
- Adam Nelson · Identité non résolueMessages de discussion1Première activité7 nov. 2014Dernière activité7 nov. 2014Première position expliciteInconnueDernière position expliciteInconnueChangements de position0Cohérence du point de vueAucune position explicite n’a été énoncéeAutres politiques4
Sources et couverture
Sources officielles
Archives des discussions publiques
- afrinic-rpd
- Première capture
- 4 août 2004
- Dernière capture
- 25 août 2026
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 13 116
- Lacunes connues
- 0
- www.afrinic.net
- afrinic-africann
- Première capture
- 3 août 2026
- Dernière capture
- 2 oct. 2026
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 2 598
- Lacunes connues
- 0
- afrinic-afripv6-discuss
- Première capture
- 17 août 2015
- Dernière capture
- 18 sept. 2026
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 2 538
- Lacunes connues
- 0
- afrinic-announce
- Première capture
- 18 août 2015
- Dernière capture
- 18 sept. 2026
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 2 497
- Lacunes connues
- 0
- afrinic-community-discuss
- Première capture
- 11 sept. 2015
- Dernière capture
- 29 déc. 2019
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 3 127
- Lacunes connues
- 0
- afrinic-dbwg
- Première capture
- 4 août 2026
- Dernière capture
- 6 oct. 2026
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 941
- Lacunes connues
- 0
- afrinic-dnssec-ops
- Première capture
- 18 août 2015
- Dernière capture
- 1 déc. 2016
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 307
- Lacunes connues
- 0
- afrinic-icp2-review
- Première capture
- 10 avr. 2025
- Dernière capture
- 10 nov. 2025
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 0
- Lacunes connues
- 0
- afrinic-measurement-wg
- Première capture
- 1 févr. 2018
- Dernière capture
- 22 nov. 2024
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 138
- Lacunes connues
- 0
- afrinic-mira
- Première capture
- 17 nov. 2020
- Dernière capture
- 22 nov. 2024
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 0
- Lacunes connues
- 0
- afrinic-ois-wg
- Première capture
- 9 sept. 2021
- Dernière capture
- 22 nov. 2024
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 0
- Lacunes connues
- 0
- afrinic-rpki-discuss
- Première capture
- 15 janv. 2016
- Dernière capture
- 23 avr. 2026
- Dernière actualisation
- 13 oct. 2026
- Couverture
- La couverture de la source est incomplète.
- Chargement
- 154
- Lacunes connues
- 0
Couverture
Partielle
Première capture: 4 août 2004
Dernière capture: 13 oct. 2026
Actualité
Lacunes connues
- www.afrinic.net: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- www.afrinic.net: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-rpd: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- www.afrinic.net: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-africann: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-afripv6-discuss: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-announce: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-community-discuss: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-dbwg: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-dnssec-ops: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-measurement-wg: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
- afrinic-rpki-discuss: La couverture de la source est incomplète. · La limite de la source n’a pas encore été atteinte.
