AFRINIC · RIR 워치독
AFRINIC Policy Development Process Bis v5
안건별 기록은 여기서 확인하세요. 무엇이 바뀌었고, 왜 중요했는지, 누가 무엇을 주장했는지, 입장이 어떻게 변했는지, 무엇이 결정되었으며, 근거가 아직 부족한 부분은 어디인지 담고 있습니다.
출처 정보
- Policy ID
- AFPUB-2017-GEN-002
- RIR
- AFRINIC
- 도입됨
- 2018. 4. 5.
- 마지막 소스 업데이트
- 2026. 11. 2.
정책 변화 과정
Working-group governance moves into a separate document · The comparison spans Draft 1 to Draft 5, rather than consecutive drafts. Draft 1 specifies a chair and vice-chair, elections, responsibilities, removal, resignation and posting restrictions in the same proposal. Draft 5 refers working-group guidelines and procedures to a separate PDP document and uses plural chairs; its history records a return to two chairs. The omitted details must not be treated as abolished everywhere.
Anonymous initiation and chair-as-editor provision is omitted · Draft 1 lets initiators remain anonymous and assigns the chair responsibility for acting as editor or finding a volunteer. Draft 5 omits that mechanism; its history attributes removal of anonymity and the chair-as-editor option to Draft 4. This is a change between the retained texts, not a claim that it first appeared in Draft 5.
출처 정보 −
One or all initiators of a policy proposal have the option to remain anonymous. Hence PDWG Chair has the responsibility to act as document editor or set a call for a volunteer from the WG to act as document editor on the policy proposal.출처 정보 ↗
출처 정보 +
3.5 policy proposals: - Remove possibility of author’s anonymity - Remove option for chairs to serve as document editor출처 정보 ↗
Adoption period changes from a maximum to a minimum · Draft 1 caps the adoption phase at two weeks. Draft 5 requires a call for adoption of at least two weeks, after which the chairs consider the views expressed and announce discussion or rejection. The old-version column embedded in Draft 5 still contains the former maximum; the main proposed text and new-version column use the minimum.
Meeting support leads into the concluding phase · Draft 5 expressly presents the proposal at the next public policy meeting after review and asks whether it has enough support to enter the concluding phase. Major objections raised in that phase must be addressed before consensus is determined. Draft 1 describes rough consensus at the end of review, before last call. Both retain later feedback and the possibility of returning to discussion.
출처 정보 −
At the end of the Review Phase, the PDWG Chair determines whether the working group has reached rough consensus.출처 정보 ↗
출처 정보 +
At the end of a meeting the chairs shall decide if a proposal has gained enough support to move to the concluding phase. Any major objection to a proposal during the concluding phase must be fully and adequately addressed prior to a determination of consensus.출처 정보 ↗
Last call must start within two weeks after the meeting · Draft 5 requires the chairs to initiate last call as soon as possible and no later than two weeks after the public policy meeting. Draft 1 starts last call after a review-phase consensus determination without that express post-meeting deadline. Both retain a last-call period of at least two weeks.
출처 정보 −
the PDWG Chair moves the draft proposal to a "Last Call for Comments" and the Concluding Phase starts.출처 정보 ↗
출처 정보 +
the PDWG Chairs shall initiate as soon as possible and not later than two(2) weeks after the Public Policy meeting a "Last Call for Comments" and the Concluding Phase starts.출처 정보 ↗
Ratification review includes process flaws and organisational harm · Draft 5 requires a comprehensive submission report and proposes ratification unless the board identifies a materially flawed process or consensus declaration, or harm to the organisation in its fiduciary role. It requires remand with reasons or specific advice. Draft 1 chiefly directs the board to check that the process was followed. This compares proposed board duties, not a legal ruling.
출처 정보 −
AFRINIC board of Directors have the obligation to check if process have been followed very well.출처 정보 ↗
출처 정보 +
The board in its fiduciary role feels that the proposal would be harmful to the organization in which case the board has a duty to remand the proposal to the community with specific advice on the problematic areas of the proposal and the risks to the organization.출처 정보 ↗
Mandatory pre-adoption board consultation is removed · Draft 1 requires the board to allow at least two weeks of working-group review before its emergency policy action. Draft 5 omits that additional consultation period and refers an adopted emergency policy to the following public policy meeting under the bylaws. The older staff assessment criticises the restriction; that criticism and the later proposed text are separate evidence.
An implementation deadline is restored · Draft 5 adds publication of the implementation date and a target of less than six months after board ratification unless a waiver is requested. Draft 1 lacks an implementation timetable, a gap explicitly identified by its staff assessment. The new clock starts at ratification, not at last-call consensus.
출처 정보 −
The current PDP specifies a timeline around the implementation of a ratified policy proposal (CPM 3.4.5), which provision is not included in this proposal.출처 정보 ↗
출처 정보 +
The implementation date should be less than six months after ratification of the proposal by the board unless a waiver is requested.출처 정보 ↗
Appeals cover adoption decisions and gain a reporting deadline · Draft 5 expressly includes adoption-phase decisions in appeals. It dates the two-week filing window from announced chair actions or decisions on the list or at a meeting, adds a maximum four-week committee report period unless waived, and states that the committee decision is final. Draft 1 uses public knowledge of the decision and has no report deadline or explicit finality clause.
Capture dates do not establish consecutive legislative steps · Draft 1 has a 2018 submission header but a revision history dating the first posting to April 2017. Draft 5 has a 10 June 2019 submission header and a history entry dated 9 June. Its embedded comparison table contrasts Drafts 4 and 5, whereas this retained request compares Drafts 1 and 5. The differences cannot all be attributed to the final revision alone.
논의 연표
참여 주체
불러오는 중…
출처 및 적용 범위
공개 토론 기록 보관소
커버리지
가장 처음 수집된 시점: 2004. 8. 4.
최근 수집: 2026. 11. 23.
