AFRINIC · RIR ウォッチ
AFPUB-2020-GEN-006-DRAFT03
提案ごとの記録はここから確認できます。何が変わり、なぜ重要だったのか、誰が何を主張し、立場がどう変化し、何が決定され、どの点で証拠がなお不足しているのかを追えます。
出典に基づく事実
- ポリシー ID
- AFPUB-2020-GEN-006-DRAFT03
- RIR
- AFRINIC
- 公式ステータス
- Ratified
- 正規化ステータス
- 承認
- 提出日
- 2021/11/22
- 出典の最終更新
- 2026/10/11
- 収録範囲
- 一部
実際に議論を方向づけたのは誰か?
ポリシーの変遷
Definition of scarce resources · Draft 2 splits the resource definition into a reference to scarce resources and a definition covering IPv4 addresses and ASNs, renumbering the following definitions. Draft 1 already covered those two resource classes. This is a terminology clarification, not a newly introduced ASN-transfer power or an extension to IPv6. The regional, reserved, legacy and global categories and the direction-specific transfer rules remain.
出典に基づく事実 +
3.1.1 “Resource” refers to "scarce resource" 3.1.2 "Scarce resource" are IPv4 Address space and Autonomous System Numbers.出典に基づく事実 ↗
First retained staff assessment and unresolved abuse controls · The first-draft capture says its staff assessment is still to come. The second includes an assessment dated 27 October 2021, which identifies ambiguities in resource categories and transfer types and warns that the absence of a hold-down period could permit repeated transfers before justified use. These are newly available staff findings; the draft does not thereby acquire a hold-down rule or prove that any abuse occurred.
出典に基づく事実 +
Absence of “hold down” time of new allocations/assignments and transferred resources may lead to abuse of the registry before a resource can be put to an effective justified need.出典に基づく事実 ↗
Legal assessment of legacy resources and responsibility · The added legal assessment questions the practical reach of obligations over legacy holders who do not register voluntarily, the treatment of legacy status on inward transfer, and the allocation of due-diligence responsibility. It proposes a limited facilitating role for AFRINIC. These are the assessment’s concerns and recommendations, not a judicial determination or proof that the proposed allocation of responsibility became binding.
出典に基づく事実 +
Thus, the authors should bear in mind that obligations impacting on legacy resource holders may not necessarily achieve the intended results if the legacy resource holders refuse to opt for voluntary registration of the transfer with AFRINIC.出典に基づく事実 ↗
Counterpart transfer compatibility · The new assessment records full reciprocity with APNIC, compatibility with RIPE NCC without a reciprocity requirement, unconfirmed compatibility with LACNIC, and a reciprocity problem with ARIN because some outbound categories remain prohibited. Those differences qualify the proposal’s inter-regional transfer objective. They are recorded assessments for this version, not evidence that transfers were operational or that another registry accepted a later version.
出典に基づく事実 +
ARIN - This proposal continues to allow general inward transfer of number resources from ARIN-region entities but prohibits the transfer out of some categories. Thus, this proposal is not reciprocal with ARIN, as ARIN does not have a restriction on outgoing Inter-RIR transfers (apart from those resources in our reserved pools.)出典に基づく事実 ↗
Implementation estimate and operational work · The second-draft assessment describes changes to transfer workflows, tagging, forms, hostmaster tools, staffing and agreements, and gives Q4 2022 on MyAFRINIC V2 as its earliest implementation estimate. The first-draft capture contains no completed assessment or comparable timetable. The estimate and planned work must remain distinct from a deployment date or proof that those systems were delivered.
出典に基づく事実 +
4.0 Implementation Timeline - Earliest we can implement same will be in Q4 2022 on MyAFRINIC V2 based on the updated plan出典に基づく事実 ↗
Draft dates and retained archival status · The revision history places draft 1 on 17 October 2020 and draft 2 on 8 October 2021, while their submitted-date headers show 27 October 2020 and 14 October 2021. Preserve that disagreement instead of presenting either header as an uncontested revision date. Both captures are marked Archived; that label does not establish a rejection, ratification or implementation decision.
出典に基づく事実 −
17 Oct 2020 Version 1: AFPUB-2020-GEN-006-DRAFT01 - Initial draft submitted to RD mailing list.出典に基づく事実 ↗
出典に基づく事実 +
8 Oct 2021 Version 2: AFPUB-2020-GEN-006-DRAFT02 * Change author email address. * Update the references出典に基づく事実 ↗
Scope of the definitions and inbound resource category · Draft 3 expressly limits its definitions to this proposal section and replaces the inbound-transfer term Any with the defined category Others. This responds to wording concerns in the earlier assessment without changing the basic regional, reserved, legacy and global framework. The later assessment still calls the definition of Others vague, including how incoming legacy resources lose legacy status; the substitution does not resolve every interpretation issue.
出典に基づく事実 −
3.3.5 If the source is from another region and the recipient is AFRINIC member, then allow "Any", and then mark the transferred resources as "Global".出典に基づく事実 ↗
出典に基づく事実 +
3.3.5 If the source is from another region and the recipient is an AFRINIC member, then allow "Others", and then mark the transferred resources as "Global".出典に基づく事実 ↗
Transfer qualification cross-reference · The resource-qualification condition now points expressly to section 3.3. The earlier assessment had called the unqualified reference to a type of transfer ambiguous, and the corresponding comment is absent from the later assessment. The new cross-reference makes the existing selection rules easier to apply; it does not add a new transfer category, remove reserved-pool restrictions or change the /24 minimum.
出典に基づく事実 −
3.4 Conditions on resources to be transferred The size of the IPv4 address prefix should be a minimum of /24. The resource must qualify for the type of transfer requested.出典に基づく事実 ↗
出典に基づく事実 +
3.4 Conditions on resources to be transferred The size of the IPv4 address prefix should be a minimum of /24. The resource must qualify for the type of transfer requested as defined in 3.3.出典に基づく事実 ↗
Source-holder entitlement and contemplated disputes · Draft 3 replaces the short requirement for the right holder with no disputes with an explicit rightful-holder requirement covering disputes that are known or contemplated. This follows the earlier staff wording recommendation and makes the condition more explicit. It does not determine ownership in a particular case or establish how a contemplated dispute would be proved.
出典に基づく事実 −
3.5 Conditions on the source Must be the right holder of the resources to be transferred with no disputes.出典に基づく事実 ↗
出典に基づく事実 +
3.5 Conditions on the source The source holder must be the rightful holder of the resources being the subject of the transfer and that the resources must not be the subject of any dispute, known or contemplated.出典に基づく事実 ↗
Assessment timetable and outstanding implementation issues · The assessment attached to draft 3 is dated 28 February 2022 and replaces the earlier Q4 2022 estimate with an estimate of twelve months. It retains concerns about the absent hold-down period, legacy-resource treatment and operational changes. Its legal subsection still calls the proposal Draft 2, and its reciprocity section contains an April 2026 update placeholder. Those internal date and version inconsistencies limit what the capture establishes; neither timetable proves implementation.
出典に基づく事実 −
4.0 Implementation Timeline - Earliest we can implement same will be in Q4 2022 on MyAFRINIC V2 based on the updated plan出典に基づく事実 ↗
出典に基づく事実 +
4.0 Implementation Timeline: The proposal will take 12 months to be implemented.出典に基づく事実 ↗
Ratified status and authorship; unchanged third-draft rules · The later third-draft capture changes the header from Archived to Ratified, names Gregoire Olaotan Ehoumi, Noah Maina and Adeola A. P. Aina, and explicitly identifies version 3 as superseding CPM section 5.7. Its submitted-date header now agrees with the revision history’s 22 November 2021. The operative transfer rules and attached staff assessment are unchanged. The added ratified-policy table also lists other proposals; their dates and implementation remarks must not be attributed to this one. These changes establish the capture’s reported ratification status, not an implementation date or completed reciprocal transfer arrangements.
出典に基づく事実 −
ID AFPUB-2020-GEN-006-DRAFT03 Date Submitted 2021-10-14 Author(s) Refer to Proposal Tab Status Archived出典に基づく事実 ↗
出典に基づく事実 +
ID AFPUB-2020-GEN-006-DRAFT03 Date Submitted 22 Nov 2021 Author(s) Gregoire Olaotan Ehoumi, Noah Maina, Adeola A. P. Aina Version 3 Obsoletes IPv4 Resources transfer within the AFRINIC Region (Section 5.7 of the CPM) Status Ratified出典に基づく事実 ↗
議論のタイムライン
エンティティ
- ディスカッションのメッセージ0初回活動不明最終活動不明最初の明示的立場不明最新の明示的立場不明立場の変化0見解の一貫性明示的な立場は示されていません他のポリシー0
出典と収録範囲
公式ポリシー資料
公開討議のアーカイブ
- afrinic-rpd
- 最初の収録
- 2004/08/04
- 最新の収録
- 2026/08/25
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 13,116
- 既知の欠落
- 0
- www.afrinic.net
- afrinic-africann
- 最初の収録
- 2026/08/03
- 最新の収録
- 2026/10/02
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 2,551
- 既知の欠落
- 0
- afrinic-afripv6-discuss
- 最初の収録
- 2015/08/17
- 最新の収録
- 2026/09/18
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 2,538
- 既知の欠落
- 0
- afrinic-announce
- 最初の収録
- 2015/08/18
- 最新の収録
- 2026/09/18
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 2,497
- 既知の欠落
- 0
- afrinic-community-discuss
- 最初の収録
- 2015/09/11
- 最新の収録
- 2019/12/29
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 3,127
- 既知の欠落
- 0
- afrinic-dbwg
- 最初の収録
- 2026/08/04
- 最新の収録
- 2026/10/06
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 900
- 既知の欠落
- 0
- afrinic-dnssec-ops
- 最初の収録
- 2015/08/18
- 最新の収録
- 2016/12/01
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 307
- 既知の欠落
- 0
- afrinic-icp2-review
- 最初の収録
- 2025/04/10
- 最新の収録
- 2025/11/10
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 0
- 既知の欠落
- 0
- afrinic-measurement-wg
- 最初の収録
- 2018/02/01
- 最新の収録
- 2024/11/22
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 138
- 既知の欠落
- 0
- afrinic-mira
- 最初の収録
- 2020/11/17
- 最新の収録
- 2024/11/22
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 0
- 既知の欠落
- 0
- afrinic-ois-wg
- 最初の収録
- 2021/09/09
- 最新の収録
- 2024/11/22
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 0
- 既知の欠落
- 0
- afrinic-rpki-discuss
- 最初の収録
- 2016/01/15
- 最新の収録
- 2026/04/23
- 最終更新
- 2026/10/11
- 収録範囲
- 情報源の網羅状況は未完了です。
- 読み込み中
- 154
- 既知の欠落
- 0
収録範囲
一部
最初の収録: 2004/08/04
最新の収録: 2026/10/11
更新状況
既知の欠落
- www.afrinic.net: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- www.afrinic.net: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-rpd: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- www.afrinic.net: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-africann: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-afripv6-discuss: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-announce: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-community-discuss: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-dbwg: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-dnssec-ops: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-measurement-wg: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
- afrinic-rpki-discuss: 情報源の網羅状況は未完了です。 · 情報源の境界にはまだ到達していません。
