Pular para o conteúdo principal

AFRINIC · Monitoramento de RIR

Resource Transfer Policy (Draft-1) Archived

Comece aqui pelo registro de cada proposta: o que mudou, por que isso foi relevante, quem defendeu cada posição, como as posições evoluíram, o que foi decidido e onde ainda há lacunas nas evidências.

Fatos com fonte

ID da política
AFPUB-2019-V4-003
RIR
AFRINIC
Apresentada
30 de out. de 2019
Última atualização das fontes
16 de out. de 2026

Quem realmente moldou o debate?

1Total de participantes
1Participantes da discussão
1Mensagens de discussão
1Participantes efetivos
100%Parcela dos cinco principais
1Pessoas cobrindo 50%
1Pessoas cobrindo 80%

Evolução da política

DRAFT02
Desconhecida · Archived
13 de ago. de 2020
Fatos com fonte ↗

Conditions on the transfer source · Draft 2 replaces the proposed explicit no-dispute condition with a requirement that the source comply with the receiving RIR's policies. This reports the clause as written, without assuming that external rules about disputes cease to apply.

Need assessment for incoming transfers · Draft 2 replaces the proposed no-needs basis and conditional ten-year plan with a needs-based evaluation for transfers into AFRINIC. This comparison concerns the proposed column, not the existing CPM conditions reproduced beside it.

Rules for outgoing transfers · Draft 2 expressly requires transfers from AFRINIC to another RIR to follow the receiving RIR's policy. The earlier proposal generally relied on mutual agreement, with a conditional plan where a needs-based region was involved.

Treatment of legacy status · Draft 1 proposes deleting the clause that strips transferred IPv4 resources of legacy status. Draft 2 instead retains that clause in its proposed column. This is a change between proposed drafts, not a claim about any completed transfer.

RIR handling of a transfer request · Draft 2 directs the source's request to the receiving RIR and refers to that RIR's policies. Draft 1 instead routes the request to the RIR where the resources are registered and refers to that transferring RIR's policies.

Staff assessment of ASN coverage · Draft 2 includes a staff warning that ASN transfers are mentioned in the summary but the operative clauses refer only to IPv4. The summary's reference to AS numbers already appears in Draft 1, so this assessment is not evidence of newly added operative ASN rules.

Notification after transfer review · Draft 2 makes the receiving RIR notify the transferring RIR and parties after approval. Draft 1 makes the transferring RIR notify the receiving RIR and parties after deciding the request can proceed.

DRAFT03
Desconhecida · Archived
13 de ago. de 2020
Fatos com fonte ↗

Disputed resources · Draft 3 restores an explicit prohibition on the source being involved in a dispute about the resources' status, alongside the receiving-RIR compliance requirement. Draft 2's proposed clause omits the explicit dispute restriction.

Further AFRINIC allocations after a transfer · Draft 3 bars a transfer source from further AFRINIC allocations or assignments for 12 months after approval. Draft 2 instead permits further resources subject to current policy. The unchanged current-policy column must not be mistaken for the earlier proposed condition.

Preservation of legacy status · Draft 3 changes the proposed clause so transferred legacy resources retain legacy status. Draft 2's proposed clause removes that status. The comparison does not itself determine the consequences for membership, registration or need assessment.

ARIN compatibility feedback · Draft 3's assessment records ARIN's negative compatibility response concerning the requirement on a source to comply with the receiving RIR's policies. Draft 2 already raised this as a staff clarification issue. This is historical feedback on that draft, not a present-day compatibility finding.

RIPE NCC process feedback · Draft 3's assessment adds RIPE NCC feedback that section 5.7.5 conflicts with its policies and procedures and cannot be implemented as written. Draft 2 had already requested clarification on the proposed standard template. This records historical feedback, not a newly enacted procedure.

Conflicting captured submission dates · The Draft 3 page still gives 2020-08-13 in its details, while its revision history dates Version 3 to 21 September 2020. Draft 2's details and version history use August. The source conflict is retained; the comparison does not invent a corrected submission date.

APNIC compatibility feedback · Draft 3's staff assessment records APNIC's negative compatibility response, particularly about applying the receiving RIR's policies to the source. Draft 2 had raised the underlying jurisdiction question without this reported APNIC response.

LACNIC feedback on the proposed procedure · Draft 3 records LACNIC's objection that the receiving-RIR-first request and notification procedure differs from how inter-RIR transfers were established. This is captured feedback, distinct from the proposal's own procedure and any later implementation.

DRAFT04
Desconhecida · Archived
18 de out. de 2020
Fatos com fonte ↗

Eligible resource holdings · Draft 4 replaces the proposed description of any holder posting a request and supplying an agreement with resources held in an AFRINIC or other RIR member account, or by a legacy holder. This changes the eligibility wording; other applicable requirements are not inferred away.

Source jurisdiction requirement · Draft 4 removes the proposed requirement that the source comply with the receiving RIR's policies, while retaining rightful-holder and no-dispute conditions. This is a textual change, not proof that the earlier cross-RIR objections were all resolved.

Holding period before retransfer · Draft 4 adds a 12-month prohibition on retransferring an incoming transferred resource. It retains the separate 12-month restriction on a source receiving new AFRINIC allocations or assignments.

Applicable policies for outgoing transfers · Draft 4 changes the outgoing-transfer clause from the receiving RIR's policy to the relevant policies. The new phrase is broader but does not enumerate which policies apply.

Recipient eligibility · Draft 4 replaces any mutually agreeing recipient with an AFRINIC or other RIR member, or a legacy holder in any region. The needs-based clause for transfers into AFRINIC remains.

Scope of legacy-status preservation · Draft 4 limits its express preservation of legacy status to incoming transferred legacy resources, whereas Draft 3 says transferred legacy resources generally. The comparison does not invent a status rule for outgoing transfers.

Detailed transfer procedure removed · Draft 4 omits the proposed 5.7.5 procedure, including the source's direct request to the receiving RIR and that RIR's notification steps. Its operative text ends after 5.7.4.3. This removes the draft's directions; it does not establish a replacement procedure.

No updated assessment established · Draft 3 includes a dated staff assessment and compatibility feedback. The retained Draft 4 page only says an assessment is to be updated. That placeholder is not evidence that the earlier concerns were resolved or that the revised proposal was approved.

Linha do tempo do debate

  1. Apresentação

    Apresentação

    Fatos com fonte ↗
  2. Versão oficial

    DRAFT01

    Desconhecida · Archived

    Fatos com fonte ↗
  3. Versão oficial

    DRAFT02

    Desconhecida · Archived

    Fatos com fonte ↗
  4. Versão oficial

    DRAFT03

    Desconhecida · Archived

    Fatos com fonte ↗
  5. Discussão pública

    [rpd] RESOURCE TRANSFER POLICY

    1 Mensagens de discussão · 1 Entidades

    Fatos com fonte ↗
  6. Versão oficial

    DRAFT04

    Desconhecida · Archived

    Fatos com fonte ↗

Entidades

Última atualização:

Carregando

Fontes e cobertura

Arquivos de discussões públicas

Cobertura

Primeiro registro: 4 de ago. de 2004
Último registro: 23 de nov. de 2026