Close Menu
  • Leadership Alliance
  • Exclusives
  • History of the Internet
  • AFRINIC News
  • Internet Governance
    • Regulations
    • Governance Bodies
    • Emerging Tech
  • Others
    • IT Infrastructure
      • Networking
      • Cloud
      • Data Centres
    • Company Stories
      • Profile
      • Startups
      • Tech Titans
      • Partner Content
    • Fintech
      • Blockchain
      • Payments
      • Regulations
    • Tech Trends
      • AI
      • AR / VR
      • IoT
    • Video / Podcast
  • Country News
    • Africa
    • Asia Pacific
    • North America
    • Lat Am/Caribbean
    • Europe/Middle East
Facebook LinkedIn YouTube Instagram X (Twitter)
Blue Tech Wave Media
Facebook LinkedIn YouTube Instagram X (Twitter)
  • Leadership Alliance
  • Exclusives
  • History of the Internet
  • AFRINIC News
  • Internet Governance
    • Regulation
    • Governance Bodies
    • Emerging Tech
  • Others
    • IT Infrastructure
      • Networking
      • Cloud
      • Data Centres
    • Company Stories
      • Profiles
      • Startups
      • Tech Titans
      • Partner Content
    • Fintech
      • Blockchain
      • Payments
      • Regulation
    • Tech Trends
      • AI
      • AR/VR
      • IoT
    • Video / Podcast
  • Africa
  • Asia-Pacific
  • North America
  • Lat Am/Caribbean
  • Europe/Middle East
Blue Tech Wave Media
Home » Germany mulls over copper network phase-out plan
German-fiber-optic-cable-installation-and-legacy-copper-lines-side-by-side
German-fiber-optic-cable-installation-and-legacy-copper-lines-side-by-side
IT Infrastructure

Germany mulls over copper network phase-out plan

By Debbie WangJanuary 21, 2026No Comments3 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email
  • The regulator wants to allow copper decommissioning when fiber coverage reaches 80 percent and wholesale access conditions are met.
  • Transition requirements, including advance notice and marketing withdrawal, aim to protect consumers, but industry stakeholders are skeptical about implementation and competition outcomes.

What happened: Germany outlines copper shutdown plans

Germany’s telecom regulator, the Federal Network Agency (Bundesnetzagentur), has published a draft regulatory framework setting out how the country could phase out its legacy copper telecommunications networks and transition fully to fiber infrastructure. The regulator presented the proposals publicly in January 2026. Under the plan, operators could shut down copper networks once fiber-to-the-home or fiber-to-the-building (FTTH/B) coverage reaches around 80 percent in a given area and suitable wholesale fiber products are available.

The draft framework requires providers to stop marketing copper-based services 24 months before decommissioning begins in any location. Operators must also issue a formal notification at least 12 months ahead of the final switch-off. The agency stresses that fiber availability, not the identity of the network builder, should determine shutdown decisions. It also prioritizes the presence of open-access wholesale fiber networks to ensure retail internet service providers can compete before copper lines are retired.

The Bundesnetzagentur has opened a consultation process and invited industry stakeholders and other interested parties to submit comments by 16 March 2026. This feedback will play a key role, as the proposals extend beyond the current legal framework. Existing legislation gives the incumbent operator, Deutsche Telekom, significant influence over copper shutdown decisions, limiting the regulator’s direct authority.

Also Read: https://btw.media/news/top-tech-news-today-january-27-2025/

Why it’s important: policy, competition and consumer implications

Germany has historically lagged many of its European peers in full fiber rollout, but recent progress has accelerated deployment. According to regulator data, around 60 percent of German households had FTTH/B pass-by coverage at the end of June 2025, up sharply from 6.7 million premises five years earlier.

This strategic shift reflects broader European infrastructure trends; fiber networks offer vastly higher speeds and future-proof capacity compared with copper, which supports slower DSL technologies. However, the regulator’s proposal raises several important questions that industry stakeholders and consumer groups are likely to scrutinize.

One such concern is competition. As noted by industry analysts, if a fiber network operator becomes the sole provider in an area after copper shutdown, there may be insufficient infrastructure-based competition, particularly in rural or less commercially attractive regions. How open access wholesale requirements will be defined and enforced remains a complex issue.

Another issue is timing and technology transition cost. While the draft rule of 80 percent coverage provides a benchmark, actual shutdowns are unlikely before 2030 and could take up to a decade to complete across different regions. Regulatory and legislative changes—potentially including amendments to Germany’s Telecommunications Act—may be needed to grant the Bundesnetzagentur authority to mandate shutdowns and ensure nondiscriminatory access for rival operators.

Environmental and consumer protections also come into play. Retiring copper infrastructure requires careful cross-sector planning, including safe recycling of materials and ensuring affordable alternatives for all users, including households and small businesses that rely on legacy DSL connections today.

In addition, this concept unfolds as the European Union considers its own timelines and flexibility on copper switch-offs, with reports suggesting the EU may allow member states to defer full copper shutdowns to as late as 2035 based on national conditions.

Ultimately, Germany’s draft outline reflects the growing recognition that legacy copper networks are technically limited in delivering future broadband capacities. But the real test lies not only in deployment pace but also in managing competition, regulatory authority, and consumer protection through this long-term infrastructure transition.

Also Read: https://btw.media/it-infrastructure/vuma-fiber-limited-powering-kenyas-digital-outskirts/

#fiber #Germany #regulation
Debbie Wang

Related Posts

Syntys expands Qatar data centre footprint with Q Data deal

January 21, 2026

Iron Mountain to develop 85MW hyperscale data center in Mumbai

January 21, 2026

Elon Musk’s Starlink stands the test in Iran crackdown

January 21, 2026
Add A Comment
Leave A Reply Cancel Reply

CATEGORIES
Archives
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023

Blue Tech Wave (BTW.Media) is a future-facing tech media brand delivering sharp insights, trendspotting, and bold storytelling across digital, social, and video. We translate complexity into clarity—so you’re always ahead of the curve.

BTW
  • About BTW
  • Contact Us
  • Join Our Team
  • About AFRINIC
  • History of the Internet
TERMS
  • Privacy Policy
  • Cookie Policy
  • Terms of Use
Facebook X (Twitter) Instagram YouTube LinkedIn
BTW.MEDIA is proudly owned by LARUS Ltd.

Type above and press Enter to search. Press Esc to cancel.